An EPEC Approach to the Yearly Maintenance Scheduling of Generating Units

被引:46
|
作者
Pandzic, Hrvoje [1 ]
Conejo, Antonio J. [2 ]
Kuzle, Igor [1 ]
机构
[1] Univ Zagreb, Zagreb 41000, Croatia
[2] Univ Castilla La Mancha, E-13071 Ciudad Real, Spain
关键词
Equilibrium problem with equilibrium constraints; generating units; maintenance scheduling; NETWORK CONSTRAINTS; TRANSMISSION;
D O I
10.1109/TPWRS.2012.2219326
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper considers the yearly maintenance scheduling of generating units within a market environment. Each producer schedules its units' maintenance periods to maximize its revenue using a bilevel approach. The upper-level problem of this bilevel model seeks maximum revenue and contains unit scheduling constraints, while the lower-level problems represent the market clearing process under different operating conditions. This single producer maintenance problem can be recast as a mathematical program with equilibrium constraints (MPEC). Since the MPECs of all producers have to be considered simultaneously and the market clearing process is common to all of them, the proposed formulation for maintenance scheduling is an equilibrium problem with equilibrium constraints (EPEC) corresponding to a multiple-leader-common-follower game. The solution of this EPEC is a set of equilibria, in which none of the producers is able to increase its revenue unilaterally by changing the maintenance periods of its generating units.
引用
收藏
页码:922 / 930
页数:9
相关论文
共 50 条
  • [41] REFINERY UNITS MAINTENANCE SCHEDULING USING INTEGER PROGRAMMING
    ALKHAMIS, TM
    YELLEN, J
    APPLIED MATHEMATICAL MODELLING, 1995, 19 (09) : 543 - 549
  • [42] BRANCH-AND-BOUND SCHEDULING FOR THERMAL GENERATING-UNITS
    CHEN, CL
    WANG, SC
    IEEE TRANSACTIONS ON ENERGY CONVERSION, 1993, 8 (02) : 184 - 189
  • [43] One New Maintenance Model of Generating Units in Power System
    Zhang, Xiaoqin
    Feng, Yuzhao
    Zhang, Heng
    Huangfu, Weihua
    Zhuo, Ming
    Chen, Yi
    MECHATRONICS, ROBOTICS AND AUTOMATION, PTS 1-3, 2013, 373-375 : 2266 - +
  • [44] The Maintenance Strategies Influence on the Reliability of Power Plant Generating Units
    Munteanu, Florin
    Nemes, Ciprian
    PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON OPTIMIZATION OF ELECTRICAL AND ELECTRONIC EQUIPMENT, VOLS 1-5, 2012, : 103 - 108
  • [45] Set of units for repair and maintenance of field and power generating equipment
    Tahautdinov, SF
    Charonov, VI
    Popov, VI
    Sadikov, AF
    Gafarov, MZ
    NEFTYANOE KHOZYAISTVO, 1998, (07): : 46 - 48
  • [46] Short-term generating unit maintenance scheduling in a deregulated power system using a probabilistic approach
    Billinton, R
    Abdulwhab, A
    IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2003, 150 (04) : 463 - 468
  • [47] Generating unit maintenance scheduling using hybrid PSO algorithm
    Park, Young-Soo
    Kim, Jin-Ho
    Park, June-Ho
    Hong, Jun-Hee
    2007 INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS APPLICATIONS TO POWER SYSTEMS, VOLS 1 AND 2, 2007, : 631 - +
  • [48] GA approach to scheduling of generator units
    Wong, YK
    Chung, TS
    Tuen, KW
    APSCOM - 2000: 5TH INTERNATIONAL CONFERENCE ON ADVANCES IN POWER SYSTEM CONTROL, OPERATION & MANAGEMENT, VOLS 1 AND 2, 2000, : 129 - 133
  • [49] Generating unit maintenance scheduling under competitive market environments
    Kim, EH
    Park, JB
    Park, JK
    Chun, YH
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2005, 27 (03) : 189 - 194
  • [50] OPTIMAL PREVENTIVE MAINTENANCE SCHEDULING OF THERMAL GENERATING-UNITS IN POWER-SYSTEMS - A SURVEY OF PROBLEM FORMULATIONS AND SOLUTION METHODS
    KRALJ, BL
    PETROVIC, R
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 35 (01) : 1 - 15