An EPEC Approach to the Yearly Maintenance Scheduling of Generating Units

被引:46
|
作者
Pandzic, Hrvoje [1 ]
Conejo, Antonio J. [2 ]
Kuzle, Igor [1 ]
机构
[1] Univ Zagreb, Zagreb 41000, Croatia
[2] Univ Castilla La Mancha, E-13071 Ciudad Real, Spain
关键词
Equilibrium problem with equilibrium constraints; generating units; maintenance scheduling; NETWORK CONSTRAINTS; TRANSMISSION;
D O I
10.1109/TPWRS.2012.2219326
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper considers the yearly maintenance scheduling of generating units within a market environment. Each producer schedules its units' maintenance periods to maximize its revenue using a bilevel approach. The upper-level problem of this bilevel model seeks maximum revenue and contains unit scheduling constraints, while the lower-level problems represent the market clearing process under different operating conditions. This single producer maintenance problem can be recast as a mathematical program with equilibrium constraints (MPEC). Since the MPECs of all producers have to be considered simultaneously and the market clearing process is common to all of them, the proposed formulation for maintenance scheduling is an equilibrium problem with equilibrium constraints (EPEC) corresponding to a multiple-leader-common-follower game. The solution of this EPEC is a set of equilibria, in which none of the producers is able to increase its revenue unilaterally by changing the maintenance periods of its generating units.
引用
收藏
页码:922 / 930
页数:9
相关论文
共 50 条
  • [1] A novel approach for maintenance scheduling of generating units in a competitive environment
    Eshraghnia, R.
    Mashhadi, H. Rajabi
    Shanechi, M. H. Modir
    Karsaz, A.
    2006 IEEE POWER INDIA CONFERENCE, VOLS 1 AND 2, 2006, : 567 - +
  • [2] The strategy for the maintenance scheduling of the generating units
    Basaran, Ü
    Kurban, M
    LESCOPE'03 : 2003 LARGE ENGINEERING SYSTEMS CONFERENCE ON POWER ENGINEERING, CONFERENCE PROCEEDINGS: ENERGY FOR THE FUTURE, 2003, : 172 - 176
  • [3] A MULTIOBJECTIVE OPTIMIZATION APPROACH TO THERMAL GENERATING-UNITS MAINTENANCE SCHEDULING
    KRALJ, B
    PETROVIC, R
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 84 (02) : 481 - 493
  • [4] Maintenance Scheduling of generating units in electric power system
    Kotb, M. F.
    2008 12TH INTERNATIONAL MIDDLE EAST POWER SYSTEM CONFERENCE, VOLS 1 AND 2, 2008, : 447 - 453
  • [5] A Tabu search algorithm for maintenance scheduling of generating units
    El-Amin, I
    Duffuaa, S
    Abbas, M
    ELECTRIC POWER SYSTEMS RESEARCH, 2000, 54 (02) : 91 - 99
  • [6] Goal programming approach to maintenance scheduling of generating units in large scale power systems
    Moro, LM
    Ramos, A
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (03) : 1021 - 1027
  • [7] TRANSMISSION CONSTRAINED MAINTENANCE SCHEDULING OF GENERATING-UNITS - A STOCHASTIC-PROGRAMMING APPROACH
    SILVA, EL
    MOROZOWSKI, M
    FONSECA, LGS
    OLIVEIRA, GC
    MELO, ACG
    MELLO, JCO
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1995, 10 (02) : 695 - 701
  • [8] Hydro generating units maintenance scheduling using benders decomposition
    Kuzle, Igor
    Pandžic, Hrvoje
    Brezovec, Miljenko
    Tehnicki Vjesnik, 2010, 17 (02): : 145 - 152
  • [9] Application of markov decision process in generating units maintenance scheduling
    Rajabi-Ghahnavie, A.
    Fotuhi-Firuzabad, M.
    2006 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS, VOLS 1 AND 2, 2006, : 768 - 773
  • [10] HYDRO GENERATING UNITS MAINTENANCE SCHEDULING USING BENDERS DECOMPOSITION
    Kuzle, Igor
    Pandzic, Hrvoje
    Brezovec, Miljenko
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2010, 17 (02): : 145 - 152