Performance analysis and improvement of geothermal binary cycle power plant in oilfield

被引:13
|
作者
Li Tai-lu [1 ,2 ]
Zhu Jia-ling [1 ,2 ]
Zhang Wei [1 ,2 ]
机构
[1] Tianjin Univ, Key Lab Efficient Utilizat Low & Medium Grade Ene, Minist Educ, Tianjin 300072, Peoples R China
[2] Tianjin Univ, Sch Mech Engn, Tianjin Geothermal Res & Training Ctr, Tianjin 300072, Peoples R China
基金
国家高技术研究发展计划(863计划);
关键词
geothermal power generation; organic Rankine cycle; energetic and exergetic analyses; oilfield; internal heat exchanger; THERMODYNAMIC PROPERTY MODEL;
D O I
10.1007/s11771-013-1507-x
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
In order to improve the efficiency of a geothermal power plant, oil wells in the high water cut stage were used as geothermal wells, thereby improving the recovery ratio and economic benefit. A new function that reflects both the technical and economic performances was put forward and used as the objective function. An organic Rankine cycle (ORC) was analyzed through the energetic and exergetic analyses, and the reasons for low efficiency were pinpointed. Results indicate that geothermal water directly transferring heat to the working fluid reduces energy dissipation and increases cycle efficiencies. The net power output with an internal heat exchanger (IHE) is averagely 5.3% higher than that without an IHE. R601a and R601 can be used to replace R123 for geothermal water below 110 A degrees C. Moreover, the modified ORC dramatically outperforms the actual one.
引用
收藏
页码:457 / 465
页数:9
相关论文
共 50 条
  • [31] Modeling and optimization of a binary geothermal power plant
    Ghasemi, Hadi
    Paci, Marco
    Tizzanini, Alessio
    Mitsos, Alexander
    ENERGY, 2013, 50 : 412 - 428
  • [32] Parametric optimization and range analysis of Organic Rankine Cycle for binary-cycle geothermal plant
    Wang, Xing
    Liu, Xiaomin
    Zhang, Chuhua
    ENERGY CONVERSION AND MANAGEMENT, 2014, 80 : 256 - 265
  • [33] Use of the Kalina cycle as a bottoming cycle in a geothermal power plant: Case study of the Wayang Windu geothermal power plant
    Prananto, Lukman Adi
    Zaini, Ilman Nuran
    Mahendranata, Bobby Irawan
    Juangsa, Firman Bagja
    Aziz, Muhammad
    Soelaiman, Tubagus Ahmad Fauzi
    APPLIED THERMAL ENGINEERING, 2018, 132 : 686 - 696
  • [34] The 125 MW Upper Mahiao geothermal power plant - Largest geothermal steam/binary combined cycle plant starts-up
    Forte, N
    GEOTHERMAL DEVELOPMENT IN THE PACIFIC RIM, 1996, 20 : 743 - 747
  • [35] Equipment of the binary-cycle geothermal power unit at the Pauzhet geothermal power station
    Tomarov G.V.
    Nikol'Skii A.I.
    Semenov V.N.
    Shipkov A.A.
    Thermal Engineering, 1600, Izdatel'stvo Nauka (61): : 406 - 410
  • [36] Thermodynamic evaluation of Denizli Kizildere geothermal power plant and its performance improvement
    Dagdas, A
    Öztürk, R
    Bekdemir, S
    ENERGY CONVERSION AND MANAGEMENT, 2005, 46 (02) : 245 - 256
  • [37] Life Cycle Analysis of a Geothermal Power Plant: Comparison of the Environmental Performance with Other Renewable Energy Systems
    Basosi, Riccardo
    Bonciani, Roberto
    Frosali, Dario
    Manfrida, Giampaolo
    Parisi, Maria Laura
    Sansone, Franco
    SUSTAINABILITY, 2020, 12 (07) : 1 - 29
  • [38] Performance analysis and binary working fluid selection of combined flash-binary geothermal cycle
    Zeyghami, Mehdi
    ENERGY, 2015, 88 : 765 - 774
  • [39] Comparison of the effectiveness of geothermal energy utilisation in the case of a power plant with organic Rankine cycle and a hybrid binary plant
    Szczecin University of Technology, Department of Heat Engineering, Piastow 19, PL 70-310 Szczecin, Poland
    Arch. Thermodyn., 2008, 4 (133-140):
  • [40] Techno-Economics Assessment of Geothermal Binary Cycle Power Plant Located in Isolated Grid
    Nur, Suardi
    Ikhwali, M. Faisi
    Aida, Nur
    INTERNATIONAL ENERGY JOURNAL, 2022, 22 (03): : 255 - 268