A mathematical model for integrating lot-sizing and scheduling problem in capacitated flow shop environments

被引:22
|
作者
Ramezanian, Reza [1 ]
Saidi-Mehrabad, Mohammad [1 ]
Teimoury, Ebrahim [1 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
关键词
Mathematical model; Permutation flow shop; Sequence-dependent setup; Setup carryover; MIP-based algorithm; DEPENDENT SETUP COSTS; JOB-SHOP; TIMES; LINE; MULTILEVEL; DECISIONS; ALGORITHM;
D O I
10.1007/s00170-012-4329-3
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, a multiproduct multiperiod capacitated production system that has been organized as a flow shop is considered. The main novelty of the paper is proposing a more efficient mathematical model for the problem of integrating lot sizing and scheduling with sequence-dependent setups. In comparison to the former model, because of fewer continuous and binary decision variables and constraints in the proposed model, this model is very easier to solve. Comparison between two models proves the superiority of the proposed model. Two mixed integer programming-based approaches with rolling horizon framework have been used to solve this model. To evaluate the performance of the proposed model and solution method, problems of different scales have been studied. The used algorithms search the solution space for both lot-sizing and scheduling problems and find a combination of production planning and scheduling that is feasible and close to optimum.
引用
收藏
页码:347 / 361
页数:15
相关论文
共 50 条
  • [41] LAGRANGIAN HEURISTICS FOR THE CAPACITATED MULTIITEM LOT-SIZING PROBLEM WITH BACKORDERING
    MILLAR, HH
    YANG, MZ
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 34 (01) : 1 - 15
  • [42] Capacitated lot-sizing with extensions: a review
    Daniel Quadt
    Heinrich Kuhn
    4OR, 2008, 6 : 61 - 83
  • [43] Dynamic programming approximation algorithms for the capacitated lot-sizing problem
    Buyuktahtakin, I. Esra
    Liu, Ning
    JOURNAL OF GLOBAL OPTIMIZATION, 2016, 65 (02) : 231 - 259
  • [44] Lot-sizing and scheduling for flexible flow lines
    Quadt, D
    LOT-SIZING AND SCHEDULING FOR FLEXIBLE FLOW LINES, 2004, 546 : 1 - +
  • [45] The robust multi-plant capacitated lot-sizing problem
    Jalal, Aura
    Alvarez, Aldair
    Alvarez-Cruz, Cesar
    De la Vega, Jonathan
    Moreno, Alfredo
    TOP, 2023, 31 (02) : 302 - 330
  • [46] The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
    Gupta, D
    Magnusson, T
    COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (04) : 727 - 747
  • [47] Simultaneous lot-sizing and scheduling in flexible job shop problems
    Rohaninejad, Mohammad
    Kheirkhah, Amirsaman
    Fattahi, Parviz
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 78 (1-4): : 1 - 18
  • [48] Simultaneous lot-sizing and scheduling in flexible job shop problems
    Mohammad Rohaninejad
    Amirsaman Kheirkhah
    Parviz Fattahi
    The International Journal of Advanced Manufacturing Technology, 2015, 78 : 1 - 18
  • [49] LOT-SIZING IN A NO-WAIT FLOW-SHOP
    EMMONS, H
    MATHUR, K
    OPERATIONS RESEARCH LETTERS, 1995, 17 (04) : 159 - 164
  • [50] Capacitated lot-sizing with extensions: A review
    Quadt, Daniel
    Kuhn, Heinrich
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2008, 6 (01): : 61 - 83