New approaches for solving the resource-constrained project scheduling problem

被引:4
|
作者
Kone, Oumar [1 ]
机构
[1] CNRS, LAAS, F-31077 Toulouse, France
来源
关键词
Schedule Problem; Binary Variable; Mixed Integer Linear Programming; Precedence Constraint; Minimum Makespan;
D O I
10.1007/s10288-011-0156-x
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
[No abstract available]
引用
收藏
页码:105 / 106
页数:2
相关论文
共 50 条
  • [21] Solving Resource-Constrained Project Scheduling Problem by A Genetic Local Search Approach
    Dridi, Olfa
    Krichen, Saoussen
    Guitouni, Adel
    [J]. 2013 5TH INTERNATIONAL CONFERENCE ON MODELING, SIMULATION AND APPLIED OPTIMIZATION (ICMSAO), 2013,
  • [22] A hybrid estimation of distribution algorithm for solving the resource-constrained project scheduling problem
    Wang, Ling
    Fang, Chen
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (03) : 2451 - 2460
  • [23] Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with SMT
    Bofill, Miquel
    Coll, Jordi
    Suy, Josep
    Villaret, Mateu
    [J]. 2016 IEEE 28TH INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE (ICTAI 2016), 2016, : 239 - 246
  • [24] LSSPER: Solving the Resource-Constrained Project Scheduling Problem with Large Neighbourhood Search
    Mireille Palpant
    Christian Artigues
    Philippe Michelon
    [J]. Annals of Operations Research, 2004, 131 : 237 - 257
  • [25] An evolutionary implicit enumeration procedure for solving the resource-constrained project scheduling problem
    Zamani, Reza
    [J]. INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2017, 24 (06) : 1525 - 1547
  • [26] Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem
    Yoosefzadeh, Hamid R.
    Tareghian, Hamed R.
    Farahi, Mohammad H.
    [J]. NAVAL RESEARCH LOGISTICS, 2014, 61 (01) : 44 - 55
  • [27] New Benchmark Results for the Stochastic Resource-Constrained Project Scheduling Problem
    Leus, Roel
    Rostami, Salim
    Creemers, Stefan
    [J]. 2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 204 - 208
  • [28] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [29] New meta-heuristics for the resource-constrained project scheduling problem
    Lim, Andrew
    Ma, Hong
    Rodrigues, Brian
    Tan, Sun Teck
    Xiao, Fei
    [J]. FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) : 48 - 73
  • [30] New meta-heuristics for the resource-constrained project scheduling problem
    Andrew Lim
    Hong Ma
    Brian Rodrigues
    Sun Teck Tan
    Fei Xiao
    [J]. Flexible Services and Manufacturing Journal, 2013, 25 : 48 - 73