Multi-objective open shop scheduling by considering human error and preventive maintenance

被引:41
|
作者
Sheikhalishahi, M. [1 ,2 ]
Eskandari, N. [1 ]
Mashayekhi, A. [1 ]
Azadeh, A. [1 ]
机构
[1] Univ Tehran, Sch Ind & Syst Engn, Coll Engn, Tehran, Iran
[2] Inst Trade Studies & Res, Tehran, Iran
关键词
Open shop scheduling; Multi-objective non-linear mixed integer programming; Human Error; Maintenance Activity; Availability; Makespan; GENETIC ALGORITHM; SINGLE-MACHINE; NSGA-II; OPTIMIZATION; TIME; MODEL; SETUP; RELIABILITY; CONSTRAINT; SYSTEMS;
D O I
10.1016/j.apm.2018.11.015
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study presents an open shop scheduling model by considering human error and preventive maintenance. The proposed mathematical model takes into account conflicting objective functions including makespan, human error and machine availability. In order to find the optimum scheduling, human error, maintenance and production factors are considered, simultaneously. Human error is measured by Human Error Assessment and Reduction Technique (HEART). Three metaheuristic methods including non-dominated sorting genetic algorithm-II (NSGA-II), multi-objective particle swarm optimization (MOPSO) and strength Pareto evolutionary algorithm II (SPEA-II) are developed to find near-optimal solution. The Taguchi method is applied by adjusting parameters of metaheuristic algorithms. Several illustrative examples and a real case study (auto spare parts manufacturer) are applied to show the applicability of the multi-objective mixed integer nonlinear programming model. The proposed approach of this study may be used for similar open shop problems with minor modifications. (C) 2018 Elsevier Inc. All rights reserved.
引用
收藏
页码:573 / 587
页数:15
相关论文
共 50 条
  • [11] Multi-objective modeling for preventive maintenance scheduling in a multiple production line
    Ebrahimipour, V.
    Najjarbashi, A.
    Sheikhalishahi, M.
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2015, 26 (01) : 111 - 122
  • [12] MULTI-OBJECTIVE INITIAL PREVENTIVE MAINTENANCE SCHEDULING FOR LARGE ENGINEERING PLANTS
    Verma, A. K.
    Ramesh, P. G.
    [J]. INTERNATIONAL JOURNAL OF RELIABILITY QUALITY & SAFETY ENGINEERING, 2007, 14 (03): : 241 - 250
  • [13] A Modified Particle Swarm Optimization for Multi-objective Open Shop Scheduling
    Sha, D. Y.
    Lin, Hsing-Hung
    Hsu, C. -Y.
    [J]. INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS (IMECS 2010), VOLS I-III, 2010, : 1844 - 1848
  • [14] A new particle swarm optimization for multi-objective open shop scheduling
    Lin, Hsing-Hung
    Sha, D. Y.
    [J]. JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2011, 32 (06): : 1269 - 1287
  • [15] Multi-objective flow shop optimal scheduling considering worker's load
    Sun, Bao-Feng
    Ren, Xin-Xin
    Zheng, Zai-Si
    Li, Guo-Yi
    [J]. Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2021, 51 (03): : 900 - 909
  • [16] Multi-objective optimization of generation maintenance scheduling considering demand response
    Yu, Chenxi
    Kong, Weilu
    Yu, Bohong
    Wang, Linyan
    [J]. Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2020, 48 (11): : 110 - 118
  • [17] Two-stage hybrid flow shop scheduling with preventive maintenance using multi-objective tabu search method
    Wang, Shijin
    Liu, Ming
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (05) : 1495 - 1508
  • [18] Multi-objective maintenance planning under preventive maintenance
    Al-Refaie, Abbas
    Almowas, Hiba
    [J]. JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2023, 29 (01) : 50 - 70
  • [19] Multi-objective scheduling algorithm for one worker job shop considering learning effect
    Hu, Jinchang
    Liu, Ziwei
    Ma, Wenkai
    Wu, Yaohua
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2021, 27 (05): : 1361 - 1370
  • [20] Multi-objective artificial bee colony for interval job shop scheduling with flexible maintenance
    Lei, Deming
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (9-12): : 1835 - 1843