共 50 条
- [42] Meta-heuristics methods for a NP-Complete networking problem 68TH IEEE VEHICULAR TECHNOLOGY CONFERENCE, FALL 2008, 2008, : 1302 - 1306
- [43] Meta-heuristics for Solving Nurse Scheduling Problem: A Comparative Study 2016 2ND INTERNATIONAL CONFERENCE ON ADVANCES IN COMPUTING, COMMUNICATION, & AUTOMATION (ICACCA) (FALL), 2016, : 40 - 44
- [44] Parallel Meta2heuristics for the Flexible Job Shop Problem ARTIFICIAL INTELLIGENCE AND SOFT COMPUTING, PT II, 2010, 6114 : 395 - +
- [45] Hybrid Meta-heuristics for the Traveling Car Renter Salesman Problem LEARNING AND INTELLIGENT OPTIMIZATION, LION 15, 2021, 12931 : 364 - 378
- [47] A Comparison Study on Meta-Heuristics for Ground Station Scheduling Problem 2014 17TH INTERNATIONAL CONFERENCE ON NETWORK-BASED INFORMATION SYSTEMS (NBIS 2014), 2014, : 172 - 179
- [48] Some meta-heuristics for no-wait flow shop problem Jisuanji Jicheng Zhizao Xitong, 2007, 5 (967-970): : 967 - 970
- [49] A Comparative Study of Meta-Heuristics for the Aircraft Landing Scheduling Problem 2016 11TH IBERIAN CONFERENCE ON INFORMATION SYSTEMS AND TECHNOLOGIES (CISTI), 2016,