The Namafjall high temperature system, NE Iceland; chemical characteristics of the fluid for a power plant

被引:2
|
作者
Olafsson, Magnus [1 ]
Armannsson, Halldor [1 ]
机构
[1] Iceland GeoSurvey ISOR, IS-108 Reykjavik, Iceland
关键词
Namafjall; Bjarnarflag; Iceland; high-temperature system; geochemistry; power plant; utilization;
D O I
10.1016/j.proeps.2013.03.207
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
Drilling commenced in the Bjarnarflag field of the Namafjall high temperature area in 1963. The first wells were shallow and some were destroyed in the Krafla Fires (1975 to 1984). At present six production wells are available in the area for a proposed 45 MWe power plant, and more wells will be drilled in the near future. The well fluid has low mineral and gas contents and is well suited for a power plant. (C) 2013 The Authors. Published by Elsevier B.V.
引用
收藏
页码:640 / 643
页数:4
相关论文
共 50 条
  • [31] High Temperature Flow Characteristics in Non-Full Opening Steam Gate Valve for Thermal Power Plant
    Yu, Long
    Yu, Shurong
    4TH ANNUAL INTERNATIONAL WORKSHOP ON MATERIALS SCIENCE AND ENGINEERING (IWMSE2018), 2018, 381
  • [32] CALCULATION OF STEAM GENERATORS FOR A HIGH TEMPERATURE NUCLEAR POWER PLANT
    HANSEN, U
    BRENNSTOFF-WARME-KRAFT, 1970, 22 (09): : 421 - &
  • [33] Welding and fabrication of high temperature components for advanced power plant
    Barnes, AM
    Jones, RL
    Abson, DJ
    Gooch, TG
    MATERIALS FOR HIGH TEMPERATURE POWER GENERATION AND PROCESS PLANT APPLICATIONS, 2000, : 153 - 176
  • [34] Microstructural Evolution in Nimonic 263 for High Temperature Power Plant
    Smith, S. A.
    West, G. D.
    Chi, K.
    Gamble, W.
    Thomson, R. C.
    ADVANCES IN MATERIALS TECHNOLOGY FOR FOSSIL POWER PLANTS: PROCEEDINGS FROM THE SIXTH INTERNATIONAL CONFERENCE, 2010, 2011, : 110 - 126
  • [35] Managing welded high-temperature components in power plant
    D'Angelo, D
    Fedeli, G
    Ramírez, ASP
    MATERIALS AT HIGH TEMPERATURES, 1999, 16 (01) : 43 - 47
  • [36] Development of on-line displacement monitoring system for high temperature steam pipe of fossil power plant
    Wook, SG
    Seob, HJ
    Young, CS
    BALTICA VI: LIFE MANAGEMENT AND MAINTENANCE FOR POWER PLANTS, VOL 1 AND 2, 2004, 233-234 : 635 - 646
  • [37] Real-time displacement monitoring system for high temperature steam pipe of fossil power plant
    Hyun, JS
    Song, GW
    Cho, SY
    Lee, YS
    ADVANCES IN FRACTURE AND STRENGTH, PTS 1- 4, 2005, 297-300 : 2164 - 2168
  • [38] Development of on-line displacement monitoring system for high temperature steam pipe of fossil power plant
    Wook, Song Gee
    Seob, Hyun Jung
    Young, Cho Sun
    VTT Symposium (Valtion Teknillinen Tutkimuskeskus), 2004, (234): : 635 - 646
  • [39] Sound power characteristics of high temperature and high pressure water leakage
    Sawai, S
    Morishita, Y
    JOURNAL OF THE ATOMIC ENERGY SOCIETY OF JAPAN, 1997, 39 (01): : 76 - 77
  • [40] Characteristics of high power capability for high temperature superconducting microwave multiplexer
    Han, SK
    Ha, YS
    Kim, J
    Kang, KY
    1997 ASIA-PACIFIC MICROWAVE CONFERENCE PROCEEDINGS, VOLS I-III, 1997, : 109 - 112