共 50 条
- [23] Discussion of key construction techniques for a shield-driven tunnel in a water-rich mixed ground [J]. Feng, H. (18638854067@163.com), 1600, China Railway Southwest Research Institute Co. Ltd., No.97 Gunan Street, West Hi-Tech Zone, Chengdu, 611731, China (51):
- [24] STRAIN MEASUREMENTS IN PRECAST CONCRETE SEGMENTS OF A SHIELD-DRIVEN TUNNEL [J]. FIB SYMPOSIUM PRAGUE 2011: CONCRETE ENGINEERING FOR EXCELLENCE AND EFFICIENCY, VOLS 1 AND 2, 2011, : 587 - 590
- [28] Coupled fluid-mechanical analysis of DOT shield tunnel construction beneath adjacent existing underpass [J]. Yantu Lixue/Rock and Soil Mechanics, 2010, 31 (06): : 1950 - 1955
- [29] Tunnel construction adjacent to existing railway tunnel [J]. TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 1133 - 1138