Reducing costs of repairable inventory supply systems via dynamic scheduling

被引:20
|
作者
Tiemessen, H. G. H. [1 ]
van Houtum, G. J. [2 ]
机构
[1] IBM Res Corp, Zurich Res Lab, Dept Math & Computat Sci, CH-8803 Ruschlikon, Switzerland
[2] Eindhoven Univ Technol, Sch Ind Engn, NL-5600 MB Eindhoven, Netherlands
关键词
Inventory control; Spare parts; Dynamic scheduling; Discrete event simulation; MULTIECHELON; PARTS; CAPACITY; MODELS; RULES;
D O I
10.1016/j.ijpe.2012.08.008
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We study a system consisting of one repair shop and one stockpoint, where spare parts of multiple critical repairables are kept on stock to serve an installed base of technical systems. Part requests are met from stock if possible, and backordered otherwise. The objective is to minimize aggregate downtime via smart repair job scheduling. We evaluate various relevant dynamic scheduling policies, including two that stem from other application fields. One of them is the myopic allocation rule from the make-to-stock environment. It selects the SKU with the highest expected backorder reduction per invested time unit and has excellent performance on repairable inventory systems. It combines the following three strengths: (i) it selects the SKU with the shortest expected repair time in case of backorders, (ii) it recognizes the benefits of short average repair times even if there are no backorders, and (iii) it takes the stochasticity of the part failure processes into account. We investigate the optimality gaps of the heuristic scheduling rules, compare their performance on a large test bed containing problem instances of real-life size, and illustrate the impact of.key problem characteristics on the aggregate downtime. We show that the myopic allocation rule performs well and that it outperforms the other heuristic scheduling rules. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:478 / 488
页数:11
相关论文
共 50 条
  • [41] SECURING SUPPLY OF ELECTRICAL ENERGY WHILE REDUCING THE COSTS
    LANGER, R
    ELEKTROTECHNISCHE ZEITSCHRIFT-ETZ, 1979, 100 (03): : 123 - 127
  • [42] Reducing Energy Costs for IBM Blue Gene/P via Power-Aware Job Scheduling
    Zhou, Zhou
    Lan, Zhiling
    Tang, Wei
    Desai, Narayan
    JOB SCHEDULING STRATEGIES FOR PARALLEL PROCESSING, JSSPP 2013, 2014, 8429 : 96 - 115
  • [43] Reducing Operating Costs by Integrating a Food Supply System
    Villarreal, Bernardo
    Guerra, Ivonne
    Larrode, Maribel
    Capetillo, Rebeca
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [44] The impact of inventory holding costs on the strategic design of supply chains
    Bolanos-Zuniga, Liliana
    Julio Vidal-Holguin, Carlos
    REVISTA FACULTAD DE INGENIERIA-UNIVERSIDAD DE ANTIOQUIA, 2021, (101): : 45 - 54
  • [45] Periodic Resource Reallocation in Two-Echelon Repairable Item Inventory Systems
    Lau, Hoong Chuin
    Pan, Jie
    Song, Huawei
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2010, 7 (03) : 474 - 485
  • [46] Computing reliability indices of repairable systems via signature
    Eryilmaz, Serkan
    JOURNAL OF COMPUTATIONAL AND APPLIED MATHEMATICS, 2014, 260 : 229 - 235
  • [47] Comparison of lot-sizing methods in aircraft repairable component inventory systems
    Ghobbar, AA
    Friend, CH
    Swift, LA
    JOURNAL OF AIRCRAFT, 2003, 40 (02): : 378 - 383
  • [48] Reducing Electricity Costs in a Dynamic Pricing Environment
    Galvan, Edgar
    Harris, Colin
    Dusparic, Ivana
    Clarke, Siobhan
    Cahill, Vinny
    2012 IEEE THIRD INTERNATIONAL CONFERENCE ON SMART GRID COMMUNICATIONS (SMARTGRIDCOMM), 2012, : 169 - 174
  • [49] Comparison of lot-sizing methods in aircraft repairable component inventory systems
    Ghobbar, A.A. (A.A.Ghobbar@city.ac.uk), 1600, American Inst. Aeronautics and Astronautics Inc. (40):
  • [50] Reducing manufacturing costs: the dynamic tolerance system
    Lorenzoni, Anselm
    Tielemann, Christopher
    Sauer, Alexander
    COGENT ENGINEERING, 2019, 6 (01):