Reducing costs of repairable inventory supply systems via dynamic scheduling
被引:20
|
作者:
Tiemessen, H. G. H.
论文数: 0引用数: 0
h-index: 0
机构:
IBM Res Corp, Zurich Res Lab, Dept Math & Computat Sci, CH-8803 Ruschlikon, SwitzerlandIBM Res Corp, Zurich Res Lab, Dept Math & Computat Sci, CH-8803 Ruschlikon, Switzerland
Tiemessen, H. G. H.
[1
]
van Houtum, G. J.
论文数: 0引用数: 0
h-index: 0
机构:
Eindhoven Univ Technol, Sch Ind Engn, NL-5600 MB Eindhoven, NetherlandsIBM Res Corp, Zurich Res Lab, Dept Math & Computat Sci, CH-8803 Ruschlikon, Switzerland
van Houtum, G. J.
[2
]
机构:
[1] IBM Res Corp, Zurich Res Lab, Dept Math & Computat Sci, CH-8803 Ruschlikon, Switzerland
We study a system consisting of one repair shop and one stockpoint, where spare parts of multiple critical repairables are kept on stock to serve an installed base of technical systems. Part requests are met from stock if possible, and backordered otherwise. The objective is to minimize aggregate downtime via smart repair job scheduling. We evaluate various relevant dynamic scheduling policies, including two that stem from other application fields. One of them is the myopic allocation rule from the make-to-stock environment. It selects the SKU with the highest expected backorder reduction per invested time unit and has excellent performance on repairable inventory systems. It combines the following three strengths: (i) it selects the SKU with the shortest expected repair time in case of backorders, (ii) it recognizes the benefits of short average repair times even if there are no backorders, and (iii) it takes the stochasticity of the part failure processes into account. We investigate the optimality gaps of the heuristic scheduling rules, compare their performance on a large test bed containing problem instances of real-life size, and illustrate the impact of.key problem characteristics on the aggregate downtime. We show that the myopic allocation rule performs well and that it outperforms the other heuristic scheduling rules. (C) 2012 Elsevier B.V. All rights reserved.
机构:
Harbin Institute of Technology, Harbin,Heilongjiang Province,150001, China
Guilin Tourism University, Guilin,Guangxi Province,541006, ChinaHarbin Institute of Technology, Harbin,Heilongjiang Province,150001, China
Yuan, Xiaojuan
Shi, Chunsheng
论文数: 0引用数: 0
h-index: 0
机构:
School of Management Harbin Institute of Technology, Harbin,Heilongjiang Province,150001, ChinaHarbin Institute of Technology, Harbin,Heilongjiang Province,150001, China
Shi, Chunsheng
International Journal of Mechatronics and Applied Mechanics,
2019,
2019
(05):
: 62
-
69
机构:
Faculty of Business, Dept. of Mgmt. Mktg. and Human Rsrc., St. Catharines, Ont., L2S 3A1, CanadaFaculty of Business, Dept. of Mgmt. Mktg. and Human Rsrc., St. Catharines, Ont., L2S 3A1, Canada
机构:
Fac Business, Dept Management Mkt & Human Resources, St Catharines, ON L2S 3A1, CanadaFac Business, Dept Management Mkt & Human Resources, St Catharines, ON L2S 3A1, Canada