Model of Trade-Off between Overlapping and Rework of Design Activities

被引:23
|
作者
Dehghan, Reza [1 ]
Ruwnapura, Janaka Y. [2 ,3 ]
机构
[1] Univ Calgary, Schulich Sch Engn, Ctr Project Management Excellence, Dept Civil Engn, Calgary, AB T2N 1N4, Canada
[2] Univ Calgary, Calgary, AB T2N 1N4, Canada
[3] Univ Calgary, Schulich Sch Engn, Ctr Project Management Excellence, Calgary, AB T2N 1N4, Canada
关键词
Fast-track construction; Overlapping; Time-cost trade-off; Rework; Construction management; Cost and schedule; PRODUCT DEVELOPMENT; INFORMATION; UNCERTAINTY; PROJECTS; TIME;
D O I
10.1061/(ASCE)CO.1943-7862.0000786
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
An effective and well-known technique for earlier completion of construction projects is to overlap the project activities that normally would be performed in sequence. Overlapping, often called fast-tracking, is inherently risky because it increases uncertainties and can result in more changes and rework. In order to gain maximum advantages from early project completion, a trade-off between benefits and losses of activity overlapping is required. In this paper, a new model has been developed to (1) explain in detail the mechanism and characteristics of design activity overlapping and (2) formulate and discuss design activity overlapping time-cost trade-off. A qualitative research methodology including interviews and focus groups with experts was used to generate and refine the model. This model contributes to the body of knowledge of construction management by demonstrating (1) how to analyze multipath networks through introducing the multi-predecessor effect and (2) how to analyze concurrent overlapping through introducing the cascade effect. The results of this paper can generate insights for further research to solve the overlapping time-cost trade-off and determine the optimum overlapping degree. (C) 2013 American Society of Civil Engineers.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] TRADE-OFF BETWEEN CORPORATE POLITICAL ACTIVITIES AND CUSTOMER ORIENTATION
    Siedentopp, Jan
    [J]. PROCEEDINGS OF THE NINETEENTH ANNUAL MEETING OF THE INTERNATIONAL ASSOCIATION FOR BUSINESS AND SOCIETY, 2008, 19 : 432 - 439
  • [2] Testing the Trade-off Between Productivity and Quality in Research Activities
    Abramo, Giovanni
    D'Angelo, Ciriaco Andrea
    Di Costa, Flavia
    [J]. JOURNAL OF THE AMERICAN SOCIETY FOR INFORMATION SCIENCE AND TECHNOLOGY, 2010, 61 (01): : 132 - 140
  • [3] Overlapping design and construction activities and an optimization approach to minimize rework
    Hossain, M. A.
    Chua, D. K. H.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (06) : 983 - 994
  • [4] New Time-Cost Trade-Off Model Considering the Sequence of Alternatives Between Activities
    Kang, Namuk
    Son, Jaeho
    Lee, Seunghyun
    [J]. JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2015, 14 (02) : 379 - 386
  • [5] THE TRADE-OFF BETWEEN SIMPLICITY AND OPTIMALITY IN MACROECONOMIC POLICY DESIGN
    CHRISTODOULAKIS, N
    LEVINE, P
    [J]. JOURNAL OF ECONOMIC DYNAMICS & CONTROL, 1987, 11 (02): : 173 - 178
  • [6] The trade-off between rate and yield in the design of microbial metabolism
    Frank, S. A.
    [J]. JOURNAL OF EVOLUTIONARY BIOLOGY, 2010, 23 (03) : 609 - 613
  • [7] Software synthesis for trade-off design
    Sato, A
    Miki, M
    Yamanouchi, T
    Watanabe, M
    [J]. PROCEEDINGS OF THE 11TH KNOWLEDGE-BASED SOFTWARE ENGINEERING CONFERENCE, 1996, : 144 - 153
  • [8] Modeling the Trade-off between Manufacturing Cell Design and Supply Chain Design
    Soolaki, M.
    Arkat, J.
    Ahmadizar, F.
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING, 2018, 31 (04): : 640 - 647
  • [9] The trade-off between speed and complexity
    Changizi, Mark Andrew
    [J]. BEHAVIORAL AND BRAIN SCIENCES, 2008, 31 (02) : 203 - +
  • [10] TRADE-OFF BETWEEN INFLATION AND UNEMPLOYMENT
    BRECHLING, F
    [J]. JOURNAL OF POLITICAL ECONOMY, 1968, 76 (04) : 712 - 737