共 50 条
- [41] Multi-objective scheduling for multi-product batch process with no-wait constraint Kongzhi yu Juece/Control and Decision, 2017, 32 (03): : 474 - 480
- [46] THE MULTI-PRODUCT FIRM CANADIAN JOURNAL OF ECONOMICS & POLITICAL SCIENCE, 1948, 14 (02): : 176 - 190
- [47] A hybrid heuristic for the multi-product straight pipeline scheduling problem IFAC PAPERSONLINE, 2019, 52 (13): : 535 - 540
- [48] Research on the problem of scheduling multi-product batches in the process industry 26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 2702 - 2707
- [49] THE SOLUTION OF THE MULTI-PRODUCT PROBLEM WITH INTEGER-VALUED FLOWS USSR COMPUTATIONAL MATHEMATICS AND MATHEMATICAL PHYSICS, 1982, 22 (03): : 245 - 249