Solving a Multi-Objective Mathematical Model for a Multi-Skilled Project Scheduling Problem by CPLEX Solver

被引:0
|
作者
Kia, Reza [1 ]
Shahnazari-Shahrezaei, Parisa [1 ]
Zabihi, Sina [1 ]
机构
[1] Islamic Azad Univ, Firoozkooh Branch, Dept Ind Engn, Firoozkooh, Iran
关键词
Multi-skilled project scheduling problem; Multi-objective mixed-integer non-linear programming; WORKFORCE;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A Multi-Skilled Project Scheduling Problem (MSPSP) that is an extension of a Multi-Mode Resource Constrained Project Scheduling Problem (MM-RCPSP) has been generally presented to schedule a project with staff members as resources. In MSPSP, each activity requires different skills and staff members have various skill levels too. This causes to encounter a huge number of modes while performing activities of a project. This research is focused on a special type of MSPSP known as Multi-Objective Multi Skilled Project Scheduling Problem (MOMSPSP) which incorporates some new objectives in the MSPSP and develops a multi-objective mixed-integer non-linear programming model for it. The problem is exactly solved for small-sized instances using CPLEX solver. the results are obtained by the CPLEX solver for small size is identified as the super solver for solving the propounded MOMSPSP.
引用
收藏
页码:1220 / 1224
页数:5
相关论文
共 50 条
  • [31] A solution framework for multi-skilled project scheduling problems with hierarchical skills
    Snauwaert, Jakob
    Vanhoucke, Mario
    JOURNAL OF SCHEDULING, 2025,
  • [32] A Multi-Skilled Mathematical Model of Bacterial Attachment in Initiation of Biofilms
    Chathoth, Kanchana
    Fostier, Louis
    Martin, Benedicte
    Baysse, Christine
    Mahe, Fabrice
    MICROORGANISMS, 2022, 10 (04)
  • [33] The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem
    Tavakkoli-Moghaddam, Reza
    Javadi, Babak
    Jolai, Fariborz
    Ghodratnama, Ali
    APPLIED SOFT COMPUTING, 2010, 10 (03) : 919 - 925
  • [34] Feedback Analysis of Thinking Model in Mathematical Problem Solving Combining Multi-objective Optimization Model
    Jiang, Minghong
    2019 11TH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA 2019), 2019, : 766 - 770
  • [35] Mathematical Model of Port Scheduling Problem Based on Multi-Objective Particle Swarm Optimization
    Wang, Nana
    Liu, Wei
    JOURNAL OF COASTAL RESEARCH, 2020, : 561 - 565
  • [36] A MILP model for an integrated project scheduling and multi-skilled workforce allocation with flexible working hours
    Karam, Ahmed
    Attia, El-Awady
    Duquenne, Philippe
    IFAC PAPERSONLINE, 2017, 50 (01): : 13964 - 13969
  • [37] A two-layer approach for solving robust decentralized multiproject scheduling problem with multi-skilled staff
    You, Weibao
    Xu, Zhe
    Yu, Yining
    Zhao, Song
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2024, 31 (03) : 1631 - 1670
  • [38] Bi-objective optimization of flexible flow shop scheduling problem with multi-skilled human resources
    Fekri, Masoud
    Heydari, Mehdi
    Mazdeh, Mohammad Mahdavi
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2024, 133
  • [39] The Multi-Skilled Resource-Constrained Project Scheduling Problem: A Systematic Review and an Exploration of Future Landscapes
    Bahroun, Zied
    As'ad, Rami
    Tanash, Moayad
    Athamneh, Raed
    MANAGEMENT SYSTEMS IN PRODUCTION ENGINEERING, 2024, 32 (01) : 108 - 132
  • [40] Solving the multi-objective nurse scheduling problem with a weighted cost function
    Parr, D.
    Thompson, J. M.
    ANNALS OF OPERATIONS RESEARCH, 2007, 155 (01) : 279 - 288