Solving a Multi-Objective Mathematical Model for a Multi-Skilled Project Scheduling Problem by CPLEX Solver

被引:0
|
作者
Kia, Reza [1 ]
Shahnazari-Shahrezaei, Parisa [1 ]
Zabihi, Sina [1 ]
机构
[1] Islamic Azad Univ, Firoozkooh Branch, Dept Ind Engn, Firoozkooh, Iran
关键词
Multi-skilled project scheduling problem; Multi-objective mixed-integer non-linear programming; WORKFORCE;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A Multi-Skilled Project Scheduling Problem (MSPSP) that is an extension of a Multi-Mode Resource Constrained Project Scheduling Problem (MM-RCPSP) has been generally presented to schedule a project with staff members as resources. In MSPSP, each activity requires different skills and staff members have various skill levels too. This causes to encounter a huge number of modes while performing activities of a project. This research is focused on a special type of MSPSP known as Multi-Objective Multi Skilled Project Scheduling Problem (MOMSPSP) which incorporates some new objectives in the MSPSP and develops a multi-objective mixed-integer non-linear programming model for it. The problem is exactly solved for small-sized instances using CPLEX solver. the results are obtained by the CPLEX solver for small size is identified as the super solver for solving the propounded MOMSPSP.
引用
收藏
页码:1220 / 1224
页数:5
相关论文
共 50 条
  • [1] Solving a multi-objective multi-skilled manpower scheduling model by a fuzzy goal programming approach
    Shahnazari-Shahrezaei, Parisa
    Tavakkoli-Moghaddam, Reza
    Kazemipoor, Hamed
    APPLIED MATHEMATICAL MODELLING, 2013, 37 (07) : 5424 - 5443
  • [2] SOLVING A NOVEL MULTI-SKILLED PROJECT SCHEDULING MODEL BY SCATTER SEARCH
    Kazemipoor, H.
    Tavakkoli-Moghaddam, R.
    Shahnazari-Shahrezaei, P.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2013, 24 (01) : 121 - 135
  • [3] Solving a new fuzzy multi-objective model for a multi-skilled manpower scheduling problem by particle swarm optimization and elite tabu search
    Shahnazari-Shahrezaei, Parisa
    Tavakkoli-Moghaddam, Reza
    Kazemipoor, Hamed
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 64 (9-12): : 1517 - 1540
  • [4] Solving a new fuzzy multi-objective model for a multi-skilled manpower scheduling problem by particle swarm optimization and elite tabu search
    Parisa Shahnazari-Shahrezaei
    Reza Tavakkoli-Moghaddam
    Hamed Kazemipoor
    The International Journal of Advanced Manufacturing Technology, 2013, 64 : 1517 - 1540
  • [5] A multi-objective model for multi-project scheduling and multi-skilled staff assignment for IT product development considering competency evolution
    Chen, Rong
    Liang, Changyong
    Gu, Dongxiao
    Leung, Joseph Y-T.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (21) : 6207 - 6234
  • [6] Multi-objective teaching-learning-based meta-heuristic algorithms to solve multi-skilled project scheduling problem
    Zabihi, Sina
    Kahag, Mahdi Rashidi
    Maghsoudlou, Hamidreza
    Afshar-Nadjafi, Behrouz
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 136 : 195 - 211
  • [7] Preemptive multi-skilled resource investment project scheduling problem: Mathematical modelling and solution approaches
    Javanmard, Shima
    Afshar-Nadjafi, Behrouz
    Niaki, Seyed Taghi Akhavan
    COMPUTERS & CHEMICAL ENGINEERING, 2017, 96 : 55 - 68
  • [8] Multi-skilled project scheduling with level-dependent rework risk; three multi-objective mechanisms based on cuckoo search
    Maghsoudlou, Hamidreza
    Afshar-Nadjafi, Behrouz
    Niaki, Seyed Taghi Akhavan
    APPLIED SOFT COMPUTING, 2017, 54 : 46 - 61
  • [9] A Conceptual Framework for Project Scheduling with Multi-skilled Resources
    Zammori, Francesco
    Bertolini, Massimo
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND INDUSTRIAL ENGINEERING (AIIE 2015), 2015, 123 : 375 - 378
  • [10] Optimizing linear project scheduling with multi-skilled crews
    Liu, Shu-Shun
    Wang, Chang-Jung
    AUTOMATION IN CONSTRUCTION, 2012, 24 : 16 - 23