High-Speed Incremental Forming Process: A Trade-Off Between Formability and Time Efficiency

被引:29
|
作者
Khalatbari, H. [1 ]
Iqbal, A. [2 ]
Shi, Xiaofan [3 ]
Gao, Lin [3 ]
Hussain, G. [4 ]
Hashemipour, M. [1 ]
机构
[1] Eastern Mediterranean Univ, Dept Mech Engn, Famagusta, Trnc, Turkey
[2] Inst Avion & Aeronaut, Dept Mech & Aerosp Engn, Islamabad, Pakistan
[3] Nanjing Univ Aeronaut & Astronaut, Coll Mech & Elect Engn, Nanjing, Jiangsu, Peoples R China
[4] GIK Inst Engn Sci & Technol, Fac Mech Engn, KPK, Swabi, Topi, Pakistan
关键词
Design; Efficiency; Experiments; Formability; Forming; Incremental; Interactive; Optimization; SHEET; PARAMETERS; MECHANICS;
D O I
10.1080/10426914.2015.1037892
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Making use of optimal experimental design, the paper attempts to investigate individual and interactive effects of predictor parameters, namely tool size, pitch size, feed rate, spindle rotational speed, and blank thickness, on sheet formability in single point incremental forming (SPIF) process. For the sake of precision, a novel sensor system was developed and employed to detect crack as it initiates on SPIF test specimens. A novel benchmark for formability in SPIF was established by addressing normal strain along sheet thickness, maximum attainable forming angle, and the rate of variation in forming angle. The process was finally optimized in terms of maximum achievable formability and minimum processing time. Accordingly, high-speed forming (with forming speed of at least 5000mm/min) was realized to be perfectly viable, whereas the sheet formability remains quite satisfactory (over 90% of the maximum value). The key role of high spindle speed (up to 3000rpm) was also highlighted in this regard.
引用
收藏
页码:1354 / 1363
页数:10
相关论文
共 50 条
  • [31] Trade-off between seed dispersal in space and time
    Chen, Si-Chong
    Poschlod, Peter
    Antonelli, Alexandre
    Liu, Udayangani
    Dickie, John B.
    ECOLOGY LETTERS, 2020, 23 (11) : 1635 - 1642
  • [32] Trade-off between quoted lead time and price
    Hatoum, KW
    Chang, YL
    PRODUCTION PLANNING & CONTROL, 1997, 8 (02) : 158 - 172
  • [33] Trade-off between quoted lead time and price
    Hatoum, Karim W.
    Chang, Yih-Long
    Production Planning and Control, 1997, 8 (02): : 158 - 172
  • [34] Trade-off between time delays and control effort
    Albertos, P
    Olivares, M
    Salgado, ME
    ADVANCES IN CONTROL EDUCATION 2000, 2001, : 287 - 291
  • [35] Trade-off between feed efficiency and immunity in specialized high-performing chickens
    Dadfar, Mohammad-Javad
    Torshizi, Rasoul Vaez
    Maghsoudi, Ali
    Ehsani, Alireza
    Masoudi, Ali Akbar
    POULTRY SCIENCE, 2023, 102 (07)
  • [37] Inequality decomposition values: the trade-off between marginality and efficiency
    Frédéric Chantreuil
    Alain Trannoy
    The Journal of Economic Inequality, 2013, 11 : 83 - 98
  • [38] Trade-off between Low Power and Energy Efficiency in Benchmarking
    Abou-Of, Mona A.
    Taha, Ahmed H.
    Sedky, Amr A.
    2016 7TH INTERNATIONAL CONFERENCE ON INFORMATION AND COMMUNICATION SYSTEMS (ICICS), 2016, : 322 - 326
  • [39] Evalution of trade-off between superelasticity and hardness of NiTi alloy regarding wear resistance under heavy load and high-speed
    Kang, Zhongxiong
    Kong, Deyin
    Jiang, Chaorui
    Liu, Mengqi
    Zhang, Zhihui
    Zhao, Jie
    WEAR, 2025, 564
  • [40] Networks That Optimize a Trade-Off between Efficiency and Dynamical Resilience
    Brede, Markus
    de Vries, Bert J. M.
    COMPLEX SCIENCES, PT 2, 2009, 5 : 2109 - +