共 38 条
- [31] All in one Go: A concept for immediate reconstruction of the compromised upper front Immediate loading and tissue reconstruction in a single operation IMPLANTOLOGIE, 2021, 29 (04): : 403 - 412
- [36] A Comparison Between Conventional Buoy Mooring CBM, Single Point Mooring SPM and Single Anchor Loading SAL Systems Considering the Hydro-meteorological Condition Limits for Safe Ship's Operation Offshore TRANSNAV-INTERNATIONAL JOURNAL ON MARINE NAVIGATION AND SAFETY OF SEA TRANSPORTATION, 2019, 13 (01) : 187 - 195