Design and Evaluation of Bayesian Dependent State Sampling Inspection Plans

被引:0
|
作者
Vijayaraghavan, R. [1 ]
Sakthivel, K. M. [1 ]
机构
[1] Bharathiar Univ, Dept Stat, Coimbatore 641046, Tamil Nadu, India
关键词
acceptable quality level; bayesian sampling plans; dependent state sampling plans; gamma distribution; operating characteristic curve; operating ratio; Poisson distribution; PRIOR DISTRIBUTIONS; SELECTION; CONSTRUCTION; PRODUCERS; CHSP-1; TABLES;
D O I
10.1520/JTE20140043
中图分类号
TB3 [工程材料学];
学科分类号
0805 ; 080502 ;
摘要
The theory of sampling inspection procedures by attributes is built upon the general assumptions that the manufacturing process from which lots are formed is stable and that the lot or process fraction nonconforming is a constant. However, in practice, the lots formed from any production process will have quality variations, which occur due to random fluctuations. When quality variations are present in a process, the proportion of nonconforming units in the lots will vary continually. In such cases, Bayesian acceptance sampling plans (BASP), which use prior information on the process variation for taking decisions about the submitted lots, can be employed as an alternative to conventional plans. This paper focuses on the concept of dependent state sampling inspection plans by attributes for continuous production with small acceptance numbers under Bayesian perspective and highlights the properties of its characteristic curves with reference to various parameters. A procedure for determining the parameters of such plans for two specified points on the operating characteristic curves under the conditions of gamma-Poisson distribution is discussed with illustrations. The closed form expressions for the parameters of the plans are also derived.
引用
收藏
页码:629 / 644
页数:16
相关论文
共 50 条
  • [31] A New Approach to Bayesian Sampling Plans
    Wilrich, Peter-Th
    FRONTIERS IN STATISTICAL QUALITY CONTROL 9, 2010, : 191 - 206
  • [32] Estimation and design of sampling plans for monitoring dependent production processes
    Vellaisamy, P
    Sankar, S
    Taniguchi, M
    METHODOLOGY AND COMPUTING IN APPLIED PROBABILITY, 2003, 5 (01) : 85 - 108
  • [33] Estimation and Design of Sampling Plans for Monitoring Dependent Production Processes
    P. Vellaisamy
    S. Sankar
    M. Taniguchi
    Methodology And Computing In Applied Probability, 2003, 5 : 85 - 108
  • [34] An economic design of rectifying single sampling plans via maxima nomination sampling in the presence of inspection errors
    Razmkhah, Mansooreh
    Gildeh, Bahram Sadeghpour
    Ahmadi, Jafar
    COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2021, 50 (01) : 217 - 233
  • [35] GENERATING A SET OF INTERRELATED INSPECTION SAMPLING PLANS
    PUGH, GA
    ELGOMAYEL, JI
    JOURNAL OF QUALITY TECHNOLOGY, 1984, 16 (01) : 39 - 43
  • [36] SAMPLING INSPECTION BY VARIABLES - CALCULATION OF THE AOQL PLANS
    Klufa, Jindrich
    APLIMAT 2005 - 4TH INTERNATIONAL CONFERENCE, PT II, 2005, : 479 - 484
  • [37] An innovative Bayesian sequential censored sampling inspection method and application to test design
    Miao, Yunfei
    Wang, Guoping
    Rui, Xiaoting
    Tu, Tianxiong
    APPLIED MATHEMATICAL MODELLING, 2019, 76 : 867 - 882
  • [38] Multiple dependent state variable sampling plans with process loss consideration
    Muhammad Aslam
    Ching-Ho Yen
    Chia-Hao Chang
    Chi-Hyuck Jun
    The International Journal of Advanced Manufacturing Technology, 2014, 71 : 1337 - 1343
  • [39] Multiple dependent state repetitive sampling plans with or without auxiliary variable
    Khan, Nasrullah
    Aslam, Muhammad
    Ahmad, Liaquat
    Jun, Chi-Hyuck
    COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2019, 48 (04) : 1055 - 1069
  • [40] Generalized Multiple Dependent State Sampling Plans in Presence of Measurement Data
    Bhattacharya, Ritwik
    Aslam, Muhammad
    IEEE ACCESS, 2020, 8 : 162775 - 162784