Windenergy-6-Megawatt-Turbine begins Operation

被引:0
|
作者
不详
机构
来源
BWK | 2012年 / 64卷 / 11期
关键词
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
引用
收藏
页码:16 / 16
页数:1
相关论文
共 50 条
  • [21] Sun Power #1 begins operation
    不详
    POWER ENGINEERING, 1999, 103 (02) : 8 - 8
  • [22] DIABLO CANYON REACTOR BEGINS OPERATION
    不详
    RESEARCH & DEVELOPMENT, 1984, 26 (08): : 48 - 48
  • [23] Kazakhstan Fuel bank begins operation
    不详
    NUCLEAR ENGINEERING INTERNATIONAL, 2019, 64 (785): : 9 - 9
  • [24] High-power operation of a 170 GHz megawatt gyrotron
    Kreischer, KE
    Kimura, T
    Danly, BG
    Temkin, RJ
    PHYSICS OF PLASMAS, 1997, 4 (05) : 1907 - 1914
  • [25] Study on operation characteristics of a compact megawatt nuclear power system
    Zhang, Minghui
    Gou, Junli
    Wang, Zheng
    Shan, Jianqiang
    ANNALS OF NUCLEAR ENERGY, 2024, 198
  • [26] BART RAIL TRANSIT SYSTEM BEGINS OPERATION
    不详
    CIVIL ENGINEERING, 1972, 42 (11): : 63 - &
  • [27] Multi-megawatt, gigajoule plasma operation in Tore Supra
    Dumont, R. J.
    Goniche, M.
    Ekedahl, A.
    Saoutic, B.
    Artaud, J-F
    Basiuk, V.
    Bourdelle, C.
    Corre, Y.
    Decker, J.
    Elbeze, D.
    Giruzzi, G.
    Hoang, G-T
    Imbeaux, F.
    Joffrin, E.
    Litaudon, X.
    Lotte, Ph
    Maget, P.
    Mazon, D.
    Nilsson, E.
    PLASMA PHYSICS AND CONTROLLED FUSION, 2014, 56 (07)
  • [28] Optical measurements of multi-megawatt wind turbine dynamic response
    Hoghooghi, Hadi
    Chokani, Ndaona
    Abhari, Reza S.
    JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, 2020, 206
  • [29] Dynamics Characteristic of Megawatt Wind Turbine Under Extreme Wind Conditions
    Li Z.
    Gao Z.
    Zhang L.
    Wang J.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2024, 44 (11): : 4417 - 4425
  • [30] Large Israeli desal plant begins operation
    Journal / American Water Works Association, 2006, 98 (01): : 52 - 53