Real-time performance measurement improves plant operations

被引:0
|
作者
Barr, R. [1 ]
机构
[1] Invensys Proc Syst, Plano, TX USA
来源
HYDROCARBON PROCESSING | 2008年 / 87卷 / 10期
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
引用
下载
收藏
页码:63 / +
页数:6
相关论文
共 50 条
  • [1] Real-Time Modeling Improves Operations
    Smith, Ron
    Opflow, 2015, 41 (09) : 22 - 23
  • [2] REAL-TIME DATA-COMPRESSION IMPROVES PLANT PERFORMANCE ASSESSMENT
    BADER, FP
    TUCKER, TW
    INTECH, 1987, 34 (08) : 53 - 56
  • [3] Real-time measurement of aqueous cyanide in mining operations
    Gering, KL
    Rosentreter, JJ
    CYANIDE: SOCIAL, INDUSTRIAL AND ECONOMIC ASPECTS, 2001, : 141 - 150
  • [4] Real-time monitoring improves LNG inventory measurement
    Hong, Sung Baek
    OIL & GAS JOURNAL, 2014, 112 (12) : 96 - 98
  • [5] REAL-TIME DIAGNOSTICS IMPROVE POWER-PLANT OPERATIONS
    HARMON, JM
    NAPOLI, J
    SNYDER, G
    POWER ENGINEERING, 1992, 96 (11) : 45 - 46
  • [6] Real-time Measurement, Computing and Visualization of Plant Structure
    Li, Guo
    Qian, Tingting
    Lu, Shenglian
    2019 THE 5TH INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING, CONTROL AND ROBOTICS (EECR 2019), 2019, 533
  • [7] A new instrument for real-time Ethernet performance measurement
    Depari, Alessandro
    Ferrari, Paolo
    Flammini, Alessandra
    Marioli, Daniele
    Taroni, Andrea
    IEEE TRANSACTIONS ON INSTRUMENTATION AND MEASUREMENT, 2008, 57 (01) : 121 - 127
  • [8] Real-Time Assessment of Robot Performance during Remote Exploration Operations
    Schreckenghost, Debra
    Fong, Terrence
    Milam, Tod
    Pacis, Estrellina
    Utz, Hans
    2009 IEEE AEROSPACE CONFERENCE, VOLS 1-7, 2009, : 79 - +
  • [9] On the same page - Real-time operations intelligence for plant floor, business.
    Kharbat, FT
    Bauer, G
    INTECH, 2005, 52 (08) : 43 - +
  • [10] Real-Time Operations Support for Geographically Dispersed Operations
    Kucs, Richard
    Lehnert, Wolfgang
    Thorogood, John
    Spoerker, Hermann
    Whatson, Neal
    SPE DRILLING & COMPLETION, 2016, 31 (03) : 236 - 246