共 50 条
- [31] An integrated vendor–buyer cooperative model under stochastic supply lead-time [J]. The International Journal of Advanced Manufacturing Technology, 2009, 41 : 1043 - 1050
- [34] Modeling Delivery Lead-time of Construction Supply Chain under Inventory Optimization [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2008, : 337 - 340
- [35] A buyer-vendor EOQ model with changeable lead-time in supply chain [J]. Hsiao, J.M. (rueymin@center.fjtc.edu.tw), 1600, Springer-Verlag London Ltd (26): : 7 - 8
- [36] A buyer-vendor EOQ model with changeable lead-time in supply chain [J]. The International Journal of Advanced Manufacturing Technology, 2005, 26 : 917 - 921
- [37] Concept and measurement of dynamic supply chain flexibility based on the shortest lead-time [J]. Proceedings of 2007 International Conference on Management Science & Engineering (14th) Vols 1-3, 2007, : 819 - 825
- [38] A buyer-vendor EOQ model with changeable lead-time in supply chain [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 26 (7-8): : 917 - 921
- [40] An integrated vendor-buyer cooperative model under stochastic supply lead-time [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (9-10): : 1043 - 1050