MW Power New biomass power plant in Zwickau

被引:0
|
作者
不详
机构
来源
BWK | 2012年 / 64卷 / 05期
关键词
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
引用
收藏
页码:35 / 35
页数:1
相关论文
共 50 条
  • [21] Demonstration of a concentrated solar power and biomass plant for combined heat and power
    Jensen, Adam R.
    Sifnaios, Ioannis
    Perers, Bengt
    Rothmann, Jan Holst
    Morch, Soren D.
    Jensen, Poul V.
    Dragsted, Janne
    Furbo, Simon
    ENERGY CONVERSION AND MANAGEMENT, 2022, 271
  • [22] Estimating Biomass Sources for a 10 MW Dendro Power Plant Using Leucaena Leucocephala Fuel Wood
    bin Muhamad, Mohd Izhwan
    Radzi, Mohd Amran Mohd
    Othman, Mohammad Lutfi
    Hizam, Hashim
    Gomes, Chandima
    Alias, Mohamad Azani
    2023 IEEE 3RD INTERNATIONAL CONFERENCE IN POWER ENGINEERING APPLICATIONS, ICPEA, 2023, : 385 - 390
  • [23] Emission characteristics of particulate matters from a 30 MW biomass-fired power plant in China
    Hu, Zhongfa
    Wang, Xuebin
    Zhang, Lan
    Yang, Shunzhi
    Ruan, Renhui
    Bai, Shengjie
    Zhu, Yiming
    Wang, Liang
    Mikulcic, Hrvoje
    Tan, Houzhang
    RENEWABLE ENERGY, 2020, 155 (155) : 225 - 236
  • [24] The characteristics of inorganic elements in ashes from a 1 MW CFB biomass gasification power generation plant
    Cuiping Liao
    Chuangzhi Wu
    Yongjie Yan
    FUEL PROCESSING TECHNOLOGY, 2007, 88 (02) : 149 - 156
  • [25] AUXILIARY POWER SYSTEM FOR A 500 TO 600 MW COAL POWER PLANT.
    Damar, R.M.
    Henschel, J.P.
    SAE Preprints, 1981,
  • [26] Study on Combustion Adjustment Characteristics of 50MW CFB Biomass-Fired Boiler in Zhanjiang Biomass Power Plant
    Fang, Jiangtao
    Song, Jinghui
    Zhan, Zhigang
    Li, Ji
    PROGRESS IN RENEWABLE AND SUSTAINABLE ENERGY, PTS 1 AND 2, 2013, 608-609 : 242 - +
  • [27] A mathematical model for transporting the biomass to biomass based power plant
    Singh, Jagtar
    Panesar, B. S.
    Sharma, S. K.
    BIOMASS & BIOENERGY, 2010, 34 (04): : 483 - 488
  • [28] AN AUXILIARY POWER SYSTEM FOR A 500 TO 600 MW COAL POWER-PLANT
    DAMAR, RM
    HENSCHEL, JP
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1981, 100 (11): : 4571 - 4577
  • [29] Forest biomass power plant installation scenarios
    Teixeira, Thaisa Ribeiro
    Alvares Soares Ribeiro, Carlos Antonio
    dos Santos, Alexandre Rosa
    Marcatti, Gustavo Eduardo
    Lorenzon, Alexandre Simoes
    Martins de Castro, Nero Lemos
    Domingues, Getulio Fonseca
    Leite, Helio Garcia
    Martins da Costa de Menezes, Sady Junior
    Santos Mota, Pedro Henrique
    de Almeida Telles, Lucas Arthur
    Vieira, Renato da Silva
    BIOMASS & BIOENERGY, 2018, 108 : 35 - 47
  • [30] Sale could rekindle biomass power plant
    不详
    PROFESSIONAL ENGINEERING, 2002, 15 (19) : 15 - 15