共 50 条
- [23] INTEGRITY MANAGEMENT PROGRAM FOR GEO-HAZARDS IN THE OCENSA PIPELINE SYSTEM [J]. PROCEEDINGS OF THE ASME INTERNATIONAL PIPELINE CONFERENCE 2010, VOL 4, 2010, : 415 - +
- [24] INTEGRITY MANAGEMENT PROGRAM FOR GEO-HAZARDS IN THE OCENSA PIPELINE SYSTEM [J]. ASME 2013 INTERNATIONAL PIPELINE GEOTECHNICAL CONFERENCE, 2013,
- [25] Implementation of a pipeline-integrity management system for Geoplin Plinovodi, Slovenia [J]. Global Pipeline Monthly, 2007, 3 (01):
- [28] Risk and integrity management of a transmission pipeline [J]. AGEING PIPELINES: OPTIMIZING THE MANAGEMENT AND OPERATION: LOW-PRESSURE - HIGH-PRESSURE, 1999, 1999 (08): : 79 - 89
- [29] THE ROLE OF EFFECTIVE COLLABORATION IN THE ADVANCEMENT OF EMAT INLINE INSPECTION TECHNOLOGY FOR PIPELINE INTEGRITY MANAGEMENT: A CASE STUDY [J]. PROCEEDINGS OF THE 9TH INTERNATIONAL PIPELINE CONFERENCE, 2012, VOL 2, 2013, : 1 - 7
- [30] Subsea Pipeline Integrity and Risk Management [J]. UNDERWATER TECHNOLOGY, 2015, 32 (04): : 283 - 283