Smagorinsky's GFDL - Building the team

被引:4
|
作者
Lewis, John M. [1 ,2 ]
机构
[1] Desert Res Inst, Reno, NV 89512 USA
[2] Natl Severe Storms Lab, Norman, OK 73069 USA
关键词
D O I
10.1175/2008BAMS2599.1
中图分类号
P4 [大气科学(气象学)];
学科分类号
0706 ; 070601 ;
摘要
Joseph Smagorinsky (1924-2005) was a forceful and powerful figure in meteorology during the last half of the twentieth century. He served as director of the Geophysical Fluid Dynamics Laboratory (GFDL) for nearly 30 yr (1955-83); and during his tenure as director, this organization substantially contributed to advances in weather forecasting and climate diagnostics/prediction. The purpose of this research is to explore Smagorinsky's philosophy of science and style of management which were central to the success of GFDL. Information herein comes from his early scientific publications, personal letters and notes in the possession of his family, several oral histories, and letters of reminiscence from scientists who worked within and outside GFDL. The principal results of the study are that 1) early inspiration and development of Smagorinsky's scientific philosophy came from his contact with Jule Charney and Harry Wexler, 2) his doctoral dissertation ideally prepared him for appointment as director of the U.S. Weather Bureau's long-range numerical prediction project in 1955 - the General Circulation Research Section (later renamed GFDL), 3) he masterfully assembled a team of researchers to attack the challenging problem of general circulation modeling, and 4) he exhibited an authoritarian style of rule tempered by protection of the scientists from disrupting outside influence while celebrating the elitism and esprit de corps that characterized the laboratory. A list of Smagorinsky's management principles is found in the appendix. Several of these tenets have been interspersed in the main body of the paper in support of actions he took at GFDL.
引用
收藏
页码:1339 / 1353
页数:15
相关论文
共 50 条
  • [22] Gilt Groupe's CEO on Building a Team of A Players
    Ryan, Kevin
    HARVARD BUSINESS REVIEW, 2012, 90 (1-2) : 43 - 46
  • [23] BUILDING A TEAM, NOT JUST A BUILDING
    LAKAMP, DW
    CIVIL ENGINEERING, 1987, 57 (07): : 70 - 72
  • [24] Building the team: developing the individual - An evaluation of team building interventions
    Haemmelmann, Anne
    van Dick, Rolf
    GRUPPENDYNAMIK UND ORGANISATIONSBERATUNG, 2013, 44 (02): : 221 - 238
  • [25] Building an Inclusive Research Team: The Importance of Team Building and Skills Training
    Strnadova, Iva
    Cumming, Therese M.
    Knox, Marie
    Parmenter, Trevor
    JOURNAL OF APPLIED RESEARCH IN INTELLECTUAL DISABILITIES, 2014, 27 (01) : 13 - 22
  • [26] Norwegian Team Designs World's Tallest Timber Building
    Reid, Robert L.
    CIVIL ENGINEERING, 2010, 80 (08): : 26 - +
  • [27] Study on strategy for building university's scientific research team
    Wang, FH
    Gu, CD
    Li, HD
    ISMOT'04: PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON MANAGEMENT OF INNOVATION AND TECHNOLOGY: MANAGING TOTAL INNOVATION IN THE 21ST CENTURY, 2004, : 779 - 781
  • [28] Leader's Role in Building Team Viability in Polish Organizations
    Chomatowska, Barbara
    Janiak-Rejno, Iwona
    Zarczynska-Dobiesz, Agnieszka
    VISION 2025: EDUCATION EXCELLENCE AND MANAGEMENT OF INNOVATIONS THROUGH SUSTAINABLE ECONOMIC COMPETITIVE ADVANTAGE, 2019, : 13254 - 13259
  • [29] There's no "I" in "team": Lessons from athletics on community building
    Wolf-Wendel, LE
    Toma, JD
    Morphew, CC
    REVIEW OF HIGHER EDUCATION, 2001, 24 (04): : 369 - +
  • [30] Building a multidisciplinary team - Europa Donna's role and contribution
    Buchanan, M
    EUROPEAN JOURNAL OF CANCER, 2002, 38 : S49 - S49