TRANSIENT STABILITY ANALYSIS OF A COMBINED CYCLE POWER PLANT USING ETAP SOFTWARE

被引:0
|
作者
Reddy, D. Sreenivasulu [1 ]
Kumari, Ch Siva [1 ]
机构
[1] Sree Vidyanikethan Engn Coll, Elect & Elect Engn, Tirupati, India
关键词
Critical clearing time; ETAP; Transient stability analysis;
D O I
10.1109/IACC.2017.103
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Recently in the operation of power systems, transient stability analysis has become a major issue because of increasing stress on power system. The transient stability analysis for large power system network is very difficult and highly non-linear problem. In this paper, different faults (like 3-phase faults, LG fault and sudden removal of generator) are considered at different bus levels in combined cycle power plant and the fault clearing times for stable operation of system (critical clearing time) are calculated by using the ETAP (Electrical Transient Analyzer Program) software.
引用
收藏
页码:510 / 515
页数:6
相关论文
共 50 条
  • [41] Transient Stability Analysis of a Flexible Generator Used in Fusion Power Plant
    Li, Hua
    Fu, Peng
    Song, Zhi-Quan
    Li, Ge
    Ul Hassan, Mahmood
    [J]. IEEE TRANSACTIONS ON PLASMA SCIENCE, 2018, 46 (05) : 1166 - 1172
  • [42] Performance enhancement of a combined cycle power plant using absorption chiller
    Eshoul, Nuri Mohamed
    Abualgasem, Fauzi
    Alkateb, Mohamed
    Lamidi, Rasaq O.
    [J]. 2020 11TH INTERNATIONAL RENEWABLE ENERGY CONGRESS (IREC), 2020,
  • [43] Optimization of Combined Cycle Power Plant Using Sequential Quadratic Programming
    Meigounpoory, Mohammad Reza
    Ahmadi, Pouria
    Ghaffarizadeh, Ahmad Reza
    Khanmohammadi, Shoaib
    [J]. HT2008: PROCEEDINGS OF THE ASME SUMMER HEAT TRANSFER CONFERENCE, VOL 1, 2009, : 109 - +
  • [44] Parametric analysis of triple pressure HRSG in combined cycle power plant
    Gudlavalleru Engineering College, Gudlavalleru, AP 521356, India
    不详
    不详
    [J]. Int. Energy J., 2006, 3 (201-205):
  • [45] Optimization and analysis of exergy, economic, and environmental of a combined cycle power plant
    Javadi, M. A.
    Hoseinzadeh, S.
    Khalaji, M.
    Ghasemiasl, R.
    [J]. SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2019, 44 (05):
  • [46] SECOND LAW AND SENSITIVITY ANALYSIS OF A COMBINED CYCLE POWER PLANT IN TURKEY
    Yilmazoglu, Mustafa Zeki
    Amirabedin, Ehsan
    [J]. ISI BILIMI VE TEKNIGI DERGISI-JOURNAL OF THERMAL SCIENCE AND TECHNOLOGY, 2011, 31 (02) : 41 - 50
  • [47] Exergy Analysis of Combined Cycle Power Plant: NTPC Dadri, India
    Tiwari, A. K.
    Hasan, M. M.
    Islam, Mohd
    [J]. INTERNATIONAL JOURNAL OF THERMODYNAMICS, 2013, 16 (01) : 36 - 42
  • [48] Exergy analysis of combined cycle power plant with carbon capture and utilization
    Prakash, Divya
    Singh, Onkar
    [J]. ENERGY SOURCES PART A-RECOVERY UTILIZATION AND ENVIRONMENTAL EFFECTS, 2020, 46 (01) : 15297 - 15318
  • [49] EXERGETIC ANALYSIS OF COMBINED CYCLE POWER PLANT WITH SINGLE STEAM EXTRACTION
    Dev, Nikhil
    Goyal, Gopal Krishan
    Attri, Rajesh
    Kumar, Naresh
    [J]. PROCEEDINGS OF THE ASME GAS TURBINE INDIA CONFERENCE, 2013, 2014,
  • [50] PROBABILISTIC OUTAGE ANALYSIS OF A COMBINED-CYCLE POWER-PLANT
    KIRCHSTEIGER, C
    TEICHMANN, J
    BALLING, L
    [J]. POWER ENGINEERING JOURNAL, 1995, 9 (03): : 137 - 141