Geometric approach and taboo search for scheduling flexible manufacturing systems

被引:20
|
作者
Mati, Y [1 ]
Rezg, N [1 ]
Xie, XL [1 ]
机构
[1] INRIA, MACSI Project, LGIPM, ENIM, F-57045 Metz, France
来源
关键词
deadlock avoidance; geometric approach; manufacturing systems; scheduling; taboo search;
D O I
10.1109/70.975998
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper addresses the scheduling and deadlock avoidance of a class of automated manufacturing systems. In such systems, a set of jobs is to be performed on a set of resources and each job requires several operations. An operation may require several types of resources with several units of each type. Further, upon the completion of an operation, its related resources cannot be released until resources needed for the next operation become available. One important characteristic of such systems is the possibility of deadlock. The scheduling problem deals with the allocation of resources such that jobs are completed within a minimal makespan and deadlocks are avoided. We extend the classical geometric approach to solve the two-job case of our model. A greedy algorithm based on this result and the taboo search heuristic are then developed for the general case. Numerical results show that the proposed algorithm is fast and provides good schedules.
引用
收藏
页码:805 / 818
页数:14
相关论文
共 50 条
  • [1] A taboo search approach for deadlock-free scheduling of automated manufacturing systems
    Yazid Mati
    Nidhal Rezg
    Xiaolan Xie
    [J]. Journal of Intelligent Manufacturing, 2001, 12 : 535 - 552
  • [2] A taboo search approach for deadlock-free scheduling of automated manufacturing systems
    Mati, Y
    Rezg, N
    Xie, XL
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2001, 12 (5-6) : 535 - 552
  • [3] Scheduling Flexible Assembly Systems with Taboo Search Algorithm
    Zhao Liang-hui
    Wang Sheng-fa
    [J]. ECBI: 2009 INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE AND BUSINESS INTELLIGENCE, PROCEEDINGS, 2009, : 172 - +
  • [4] Evaluation of scatter-search approach for scheduling optimization of flexible manufacturing systems
    M. Saravanan
    A. Noorul Haq
    [J]. The International Journal of Advanced Manufacturing Technology, 2008, 38 : 978 - 986
  • [5] Evaluation of scatter-search approach for scheduling optimization of flexible manufacturing systems
    Saravanan, M.
    Haq, A. Noorul
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 38 (9-10): : 978 - 986
  • [6] A hybrid heuristic search algorithm for scheduling flexible manufacturing systems
    Xiong, HH
    Zhou, MC
    Caudill, RJ
    [J]. 1996 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, PROCEEDINGS, VOLS 1-4, 1996, : 2793 - 2797
  • [7] Scheduling and Control of Flexible Manufacturing Systems: a Holonic Approach
    Arauzo, J. A.
    del-Olmo-Martinez, R.
    Lavios, J. J.
    de-Benito-Martin, J. J.
    [J]. REVISTA IBEROAMERICANA DE AUTOMATICA E INFORMATICA INDUSTRIAL, 2015, 12 (01): : 58 - 68
  • [8] Anytime heuristic search for scheduling flexible manufacturing systems: a timed colored Petri net approach
    Olatunde T. Baruwa
    Miquel A. Piera
    [J]. The International Journal of Advanced Manufacturing Technology, 2014, 75 : 123 - 137
  • [9] Anytime heuristic search for scheduling flexible manufacturing systems: a timed colored Petri net approach
    Baruwa, Olatunde T.
    Piera, Miquel A.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 75 (1-4): : 123 - 137
  • [10] A Tabu search-based approach for scheduling job-shop type flexible manufacturing systems
    Logendran, R
    Sonthinen, A
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1997, 48 (03) : 264 - 277