Important viewpoints of maintenance scheduling in restructured power systems

被引:0
|
作者
Esmaeilzadeh, R. [1 ]
Amjadi, A. [1 ]
Eskandari, H. [1 ]
Farrokhifar, M. [1 ]
机构
[1] Islamic Azad Univ, Marand Branch, Tehran, Iran
关键词
maintenance scheduling; restructured power systems; grid reliability; generation cost; independent system operator (ISO);
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Maintenance scheduling establishes the outage time scheduling of units in a particular time horizon. In a monopolistic power system, maintenance scheduling is being done only upon the technical requirements of power plants and preserving the grid reliability, while in restructured power systems, technical viewpoints and system reliability are taken into consideration in maintenance scheduling with respect to the economical viewpoints. In this paper the meanings of technical viewpoint, system reliability and economical viewpoint in maintenance scheduling, are provided. Therefore, we will have a clear vision of system stability in view point of independent system operator (ISO), calculation and evaluation method of power plants reliability indicators, generation costs (operating and unit maintenance costs) and effective factors of maintenance. Then we will discuss on the maintenance scheduling in restructured power systems from the ISO and suppliers viewpoints. Comparing the existing models in this topic, we will try to represent proper models for each of the mentioned viewpoints.
引用
收藏
页码:2144 / 2151
页数:8
相关论文
共 50 条
  • [41] Automatic generation control in restructured electric power systems
    Nargelas, A
    [J]. AUTOMATED SYSTEMS BASED ON HUMAN SKILL 2000: JOINT DESIGN OF TECHNOLOGY AND ORGANISATION, 2000, : 233 - 236
  • [42] Optimal reserve management for restructured power generating systems
    Ding, Yi
    Wang, Peng
    Lisnianski, Anatoly
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2006, 91 (07) : 792 - 799
  • [43] A NEW FRAMEWORK FOR CAPACITY MARKET IN RESTRUCTURED POWER SYSTEMS
    Babaeinejadsarookolaee, S.
    Foroud, A. Akbari
    [J]. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF ELECTRICAL ENGINEERING, 2015, 39 (E2) : 115 - 131
  • [44] Dispatching of Active Power Reserve for Higher Reliability of Restructured Power Systems
    Ameli, Mohammad Taghi
    Moslehpour, Saeid
    Farzadpour, Ziba
    [J]. TECHNOLOGICAL DEVELOPMENTS IN EDUCATION AND AUTOMATION, 2010, : 499 - +
  • [45] Distributed fuel cell generation in restructured power systems
    Williamson, SS
    Emadi, A
    Shahidehpour, M
    [J]. 2004 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1 AND 2, 2004, : 2079 - 2084
  • [46] A Comprehensive Approach to Demand Response in Restructured Power Systems
    Duy Thanh Nguyen
    Negnevitsky, Michael
    de Groot, Martin
    [J]. 2010 20TH AUSTRALASIAN UNIVERSITIES POWER ENGINEERING CONFERENCE (AUPEC 2010): POWER QUALITY FOR THE 21ST CENTURY, 2010,
  • [47] A joint optimization approach on monthly unit commitment and maintenance scheduling for wind power integrated power systems
    Zhou, Ming
    Xia, Shu
    Li, Yan
    Li, Gengyin
    [J]. Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2015, 35 (07): : 1586 - 1595
  • [48] Scheduling Maintenance for Reliable Transmission Systems
    Poyrazoglu, Gokturk
    Oh, HyungSeon
    [J]. 2016 IEEE/PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXPOSITION (T&D), 2016,
  • [49] Diagnostic and Predictive Maintenance Systems for Abnormal Behavior of Power Scheduling Loading and its Application to Robotics Systems
    Huang, Han-Pang
    Wu, Shih-Hsien
    [J]. 2011 9TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA 2011), 2011, : 908 - 913
  • [50] PREVENTIVE MAINTENANCE SCHEDULING IN POWER GENERATION SYSTEMS USING A QUANTITATIVE RISK CRITERION.
    Billinton, Roy
    El-Sheikhi, Farag A.
    [J]. Canadian electrical engineering journal, 1983, 8 (01): : 28 - 39