Multi-objective Assembly Line Balancing Problem with Bounded Processing Times, Learning Effect, and Sequence-dependent Setup Times

被引:0
|
作者
Hamta, Nima [1 ]
Ghomi, S. M. T. Fatemi [1 ]
Hakimi-Asiabar, M. [1 ]
Tabrizi, P. Hooshangi [1 ]
机构
[1] Amirkabir Univ Technol, Dept Ind Engn, Tehran, Iran
关键词
Assembly line balancing; multi-objective optimization; bounded processing times; learning effect; sequence-dependent setup times; MACHINE;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses multi-objective optimization of a single-model assembly line balancing problem where the processing times of tasks are unknown variables and the only known information is the lower and upper bounds for processing time of each task. Three objectives are simultaneously considered as follows: (1) minimizing the cycle time, (2) minimizing the equipment cost, and (3) minimizing the smoothness index. In order to reflect the real-world situation adequately, we assume that the task time is dependent on worker(s) (or machine(s)) learning for the same or similar activity and also sequence-dependent setup time exists between tasks. Furthermore, a solution method based on the combination of two multi-objective decision-making methods, weighted and min-max techniques, is proposed to solve the problem. Finally, a numerical example is presented to demonstrate how the proposed methodology provides Pareto optimal solutions.
引用
收藏
页码:768 / 772
页数:5
相关论文
共 50 条
  • [21] Balancing and scheduling tasks in parallel assembly lines with sequence-dependent setup times
    Ozcan, Ugur
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2019, 213 : 81 - 96
  • [22] Balancing two-sided assembly lines with sequence-dependent setup times
    Ozcan, Ugur
    Toklu, Bilal
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (18) : 5363 - 5383
  • [23] Multi-Objective Assembly Line Balancing Problem with Setup Times Using Fuzzy Goal Programming and Genetic Algorithm
    Lee, Amy H. I.
    Kang, He-Yau
    Chen, Chong-Lin
    SYMMETRY-BASEL, 2021, 13 (02): : 1 - 28
  • [24] MULTI-OBJECTIVE UNRELATED PARALLEL MACHINES SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENCE CONSTRAINTS
    Tavakkoli-Moghaddam, R.
    Taheri, F.
    Bazzazi, M.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2008, 21 (03): : 269 - 278
  • [25] Metaheuristic algorithms for balancing robotic assembly lines with sequence-dependent robot setup times
    Janardhanan, Mukund Nilakantan
    Li, Zixiang
    Bocewicz, Grzegorz
    Banaszak, Zbigniew
    Nielsen, Peter
    APPLIED MATHEMATICAL MODELLING, 2019, 65 : 256 - 270
  • [26] A Proposed Multi-objective Optimization Model for Sequence-dependent Disassembly Line Balancing Problem
    Liu Jia
    Wang Shuwei
    2017 3RD INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT (ICIM 2017), 2017, : 421 - 425
  • [27] A FLOWSHOP PROBLEM WITH SEQUENCE-DEPENDENT ADDITIVE SETUP TIMES
    SZWARC, W
    GUPTA, JND
    NAVAL RESEARCH LOGISTICS, 1987, 34 (05) : 619 - 627
  • [28] LINE BALANCING FOR NONTRADITIONAL ASSEMBLY LINES, MIXED MODELS, AND SEQUENCE-DEPENDENT ASSEMBLY TIMES
    BENARIEH, D
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1995, 8 (04) : 286 - 297
  • [29] The sequence-dependent assembly line balancing problem
    Armin Scholl
    Nils Boysen
    Malte Fliedner
    OR Spectrum, 2008, 30 : 579 - 609
  • [30] The sequence-dependent assembly line balancing problem
    Scholl, Armin
    Boysen, Nils
    Fliedner, Malte
    OR SPECTRUM, 2008, 30 (03) : 579 - 609