The central plant at the University of Southern Indiana currently serves 18 campus buildings over 300 acres. The central plant produces and circulates chilled water for air handlers at the individual buildings. The system includes primary chiller pumps, second ay circulation pumps to deliver flow throughout the campus and tertiary pumps in each campus building. The chilled water system consists of five chillers, a chilled water storage tank and a plate and frame heat exchanger that can be used when the outdoor air temperatures are low enough. The total capacity is 6500 tons of cooling. The system has been added to numerous times over the past 40 years, by different engineering firms, each implementing different system considerations. Through the years, buildings and units have been added to the system, and HVAC operators have left and new ones have been hired, resulting in some inefficient practices. The physical plant manager initiated a request for updated training of the operators and analysis of the system to reduce energy expenses. This paper discusses methods of energy savings that relate to the chilled water supply: a correction of improper use of the chilled water tank, the development of a graphical method for chiller staging, and the identification of system conditions that will result in negative readings from the differential pressure transmitter that is used to control the secondary circulation pumps. Part of the system analysis was done as part of a senior-level thermal science class, which is also discussed. It has been demonstrated that HVAC system training for the operators can result in increased energy-efficiency in system operation.
引用
收藏
页码:309 / 316
页数:8
相关论文
共 50 条
  • [41] Plant operator simulation: benefits and drawbacks for a construction training organization
    Jennifer Tichon
    Phil Diver
    [J]. Cognition, Technology & Work, 2010, 12 : 219 - 229
  • [42] Combined Cycle Power Plant Simulator for Operator's Training
    Zabre, E.
    Roldan-Villasana, E. J.
    Romero-Jimenez, G.
    Cruz, R.
    [J]. WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 961 - +
  • [43] Plant operator simulation: benefits and drawbacks for a construction training organization
    Tichon, Jennifer
    Diver, Phil
    [J]. COGNITION TECHNOLOGY & WORK, 2010, 12 (03) : 219 - 229
  • [44] ESTABLISHING AN OPERATOR TRAINING STATION FOR THE ROVNO NUCLEAR-PLANT
    FEDOROV, OM
    ARISTOV, BN
    [J]. SOVIET ATOMIC ENERGY, 1991, 70 (06): : 494 - 496
  • [45] Remote Control-Based Energy Management for Energy Savings in a Central Heating System
    Sahin, Volkan
    Ipek, Osman
    Basogul, Yusuf
    Gurel, Baris
    Kecebas, Ali
    [J]. ENVIRONMENTAL PROGRESS & SUSTAINABLE ENERGY, 2017, 36 (02) : 600 - 609
  • [46] Different designs in energy savings of SWRO Plant of Las Palmas III
    Lemes, Raul
    Falcon, Raul
    Arocha, Rafael
    Curbelo, Jacinto
    Platas, Victor
    De Lorenzo, Laura
    [J]. DESALINATION AND WATER TREATMENT, 2013, 51 (4-6) : 749 - 758
  • [47] POWER-PLANT ENERGY SAVINGS WITH RETROFITTED DISTRIBUTED CONTROLS AND COMPUTER
    HARPER, D
    HAGNER, B
    FROST, S
    [J]. TAPPI JOURNAL, 1984, 67 (02): : 72 - 77
  • [48] PLANT ENGINEERING SAVINGS
    INGRAM, A
    [J]. AMERICAN DAIRY REVIEW, 1977, 39 (12): : 22 - &
  • [49] Conceptual Design of an Operator Training Simulator for a Bio-Ethanol Plant
    Gerlach, Inga
    Hass, Volker C.
    Mandenius, Carl-Fredrik
    [J]. PROCESSES, 2015, 3 (03): : 664 - 683
  • [50] Some tools for simplified modelling for power plant operator training simulators
    Sulc, B
    [J]. Proceedings of the 23rd IASTED International Conference on Modelling, Identification, and Control, 2004, : 294 - 299