Service Life Forecast and Evaluation of Transmission System for Complicated Equipment

被引:0
|
作者
Cao, Lijun [1 ]
Hu, Huibin [2 ]
Yu, Guibo [1 ]
Wang, Shuhai [1 ]
Ma, Qiao [1 ]
Zhi, Jianzhuang [1 ]
机构
[1] Shijiazhuang Mech Engn Coll, Shijiazhuang, Hebei, Peoples R China
[2] Shijiazhuang Army Command Coll, Shijiazhuang Mech Engn Coll, Shijiazhuang, Hebei, Peoples R China
关键词
transmission system; finite element analysis; service life; virtual prototype; forecast; OPTIMIZATION; ALGORITHM;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Transmission system is the key subsystem of Complicated equipment to realize its maneuverability. Statistic data show that 36 percent of chassis faults is caused by transmission system. To overcome the difficulties of battle decision in confirming appropriate maintenance periods and allocating maintenance resource, a new kind service life and evaluation method based on virtual prototype and Finite Element Analysis (FEA) is put forward firstly. The three-dimensional solid models of transmission system is established and assembled in Pro/E. By adding relevant forces and constraints, the working and fault emergence and development processes are simulated in MSC. ADAMS. The FEA models of key components are established in MSC. Patran and FE-FATIGUE. On the basis of simulation results of virtual prototype and FEA analysis results, the service life of key components of transmission system can be calculated.
引用
收藏
页码:785 / 788
页数:4
相关论文
共 50 条
  • [21] Coupling life cycle assessment and life cycle costing as an evaluation tool for developing product service system of high energy-consuming equipment
    Zhang, Wujie
    Guo, Jianfeng
    Gu, Fu
    Gu, Xinjian
    JOURNAL OF CLEANER PRODUCTION, 2018, 183 : 1043 - 1053
  • [23] EPOCH SYSTEM - NEW EQUIPMENT PRACTICE FOR TRANSMISSION EQUIPMENT
    MIYAZAKI, T
    TSUBONO, K
    IMAI, H
    NAKAJIMA, R
    KOSUGI, T
    NEC RESEARCH & DEVELOPMENT, 1972, (27): : 70 - 75
  • [24] ENERGY EVALUATION OF FOOD-SERVICE EQUIPMENT AND CENTRAL FOOD PREPARATION SYSTEM
    HU, KH
    ROBERTS, W
    ACTIVITIES REPORT-RESEARCH AND DEVELOPMENT ASSOCIATES FOR MILITARY FOOD AND PACKAGING SYSTEMS INC, 1980, 32 (02): : 144 - 150
  • [25] ECONOMIC COMPARISON OF ALTERNATIVES - IN EQUIPMENT SERVICE LIFE
    JELEN, FC
    MATERIALS PROTECTION, 1965, 4 (03): : 23 - &
  • [26] Grounding of strength and service life of power equipment
    Sudakov, A.V.
    Levchenko, A.I.
    Danyushevskij, I.A.
    Ivanov, B.N.
    Smelkov, L.L.
    Tyazheloe Mashinostroenie, 1997, (09): : 38 - 41
  • [27] ECONOMIC SERVICE LIFE OF BUILDING CONSTRUCTION EQUIPMENT
    SELINGER, S
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1983, 109 (04): : 398 - 405
  • [28] A MODEL FOR DETERMINING THE AVERAGE SERVICE LIFE OF EQUIPMENT
    ORENSTEEN, RB
    OPERATIONS RESEARCH, 1957, 5 (04) : 596 - 596
  • [29] Assessment of service life of sophisticated medical equipment
    Toporkov A.A.
    Biomedical Engineering, 2007, 41 (3) : 122 - 127
  • [30] A novel framework of the Life Cycle Asset Management for transmission and transformation equipment of power system
    Wu, Yue
    Wan, Junbiao
    Wang, Keyi
    Ma, Rui
    INDUSTRIAL INSTRUMENTATION AND CONTROL SYSTEMS, PTS 1-4, 2013, 241-244 : 773 - +