An Integrated Scheduling Algorithm Based on a Process End Time-Driven and Long-Time Scheduling Strategy

被引:0
|
作者
Zhan, Xiaojuan [1 ,2 ]
Xie, Zhiqiang [1 ]
Yao, Dengju [1 ]
机构
[1] Harbin Univ Sci & Technol, Sch Comp Sci & Technol, Harbin 150080, Peoples R China
[2] Heilongjiang Inst Technol, Coll Comp Sci & Technol, Harbin 150050, Peoples R China
来源
SYMMETRY-BASEL | 2022年 / 14卷 / 10期
基金
中国国家自然科学基金;
关键词
integrated scheduling algorithm; process end time-driven; long-time scheduling strategy; long-path scheduling strategy; machining and assembling; single complex product; GENETIC ALGORITHM; SHOP; OPTIMIZATION; SYSTEMS;
D O I
10.3390/sym14102106
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The integrated scheduling problem is a classical combinatorial optimization problem. The existing integrated scheduling algorithms generally adopt the short-time scheduling strategy that does not fully consider the impact of the degree of process parallelism on scheduling results. In order to further optimize the total processing time of a product and the utilization rate of a device, an integrated scheduling algorithm based on a process end time-driven and the long-time scheduling strategy is proposed. The proposed integrated scheduling algorithm sets up a separate candidate process queue for each device and determines the scheduling order for each scheduling queue on the premise of satisfying the constraint conditions of the process tree. Driven by the process end time, the algorithm finds schedulable processes for each device. If the schedulable process is unique, it is scheduled. Otherwise, if the schedulable process is not unique, the process with long-path and long-time is scheduled. In particular, the scheduling strategies of the scheduling queues of different devices are symmetric, and the constraint relationships between the processes in different queues are asymmetric. The case analysis results show that the proposed integrated scheduling algorithm is better than some existing algorithms in terms of the total processing time of a product and the average utilization rate of devices. Therefore, the proposed algorithm provides a new idea for processing the scheduling of a single complex product.
引用
收藏
页数:16
相关论文
共 50 条
  • [21] Electric Vehicle Charging and Discharging Scheduling Strategy Considering Psychological Effect of Mileage Anxiety on a Long-time Scale
    Hou H.
    Wang Y.
    Wu X.
    Chen Y.
    Huang L.
    Zhang R.
    Gaodianya Jishu/High Voltage Engineering, 2023, 49 (01): : 85 - 94
  • [22] Multi-objective genetic algorithm for integrated process planning and scheduling with fuzzy processing time
    Wen, Xiaoyu
    Li, Xinyu
    Gao, Liang
    Wan, Liang
    Wang, Wenwen
    2013 SIXTH INTERNATIONAL CONFERENCE ON ADVANCED COMPUTATIONAL INTELLIGENCE (ICACI), 2013, : 293 - 298
  • [23] Integrated process planning and scheduling based on an ant colony algorithm
    Wang, Jinfeng
    Yin, Guofu
    Lei, Qianzhao
    Zhang, Chao
    Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2012, 42 (SUPPL. 1): : 173 - 177
  • [24] Reliability in a time-driven product development process
    Lu, Y
    Loh, HT
    Ibrahim, Y
    Sander, PC
    Brombacher, AC
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 1999, 15 (06) : 427 - 430
  • [25] Coordinating optimal model of generation quipments long-time maintenance scheduling in market
    Zeng Ming
    Tang Yongsheng
    Zheng Lin
    Li Chen
    2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
  • [26] Energy based scheduling algorithm for real time system
    Sharma, Nitin
    Yadav, Rama Shankar
    2006 INTERNATIONAL CONFERENCE ON ADVANCED COMPUTING AND COMMUNICATIONS, VOLS 1 AND 2, 2007, : 490 - 493
  • [27] Scheduling Algorithm Based on Time-Trigger Bus
    Cheng, Bowen
    Wang, Luyuan
    Liu, Weiwei
    Zeng, Lianlian
    PROCEEDINGS OF 2016 IEEE 13TH INTERNATIONAL CONFERENCE ON SIGNAL PROCESSING (ICSP 2016), 2016, : 1787 - 1790
  • [28] Real-time scheduling algorithm based on Linux
    Information Network Engineering Research Center, South China University of Technology, Guangzhou 510640, China
    Huanan Ligong Daxue Xuebao/Journal of South China University of Technology (Natural Science), 2008, 36 (04): : 104 - 109
  • [29] Due time driven surgery scheduling
    Samudra, Michael
    Demeulemeester, Erik
    Cardoen, Brecht
    Vansteenkiste, Nancy
    Rademakers, Frank E.
    HEALTH CARE MANAGEMENT SCIENCE, 2017, 20 (03) : 326 - 352
  • [30] Due time driven surgery scheduling
    Michael Samudra
    Erik Demeulemeester
    Brecht Cardoen
    Nancy Vansteenkiste
    Frank E. Rademakers
    Health Care Management Science, 2017, 20 : 326 - 352