Evaluation of erosion risk at the base of an electric power transmission line

被引:0
|
作者
deCarvalho, JC
Pereira, JHF
Guimaraes, RC
dosSantos, RMM
机构
关键词
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The Brazilian Federal District is covered by a porous, collapsible tropical soil layer with thickness that can reach 30 meters. Below this layer it can usually be found a stratum of saprolite over slate or metarrythymites strata. Commonly the water table is found at the contact between the porous soil and the saprolite. It is common in this region for the occurrence of gullies and piping. In many cases the piping mechanism is triggered by an increase in surficial water hydraulic gradient in regions of gullies due to the combined action of gradient increase and water table lowering. In view of the regional aspects presented above, this work describes the evaluation of the possibility of a gully reaching an electric power transmission line in its final stage of construction. Studies on the possibility of the gully to move towards the transmission line ii were carried out as well as a surveying on the water table in the area and the direction of the groundwater flow. Laboratory tests were also performed to study the soils in the region, such as soil classification tests and erodibility tests (double-sedimentation, pinhole and Inderbitzen tests). This study indicates that there are no risks for the transmission electric power line being affected by the piping mechanism in the existing erosion process (i.e., gully).
引用
收藏
页码:29 / 44
页数:16
相关论文
共 50 条
  • [1] Evaluation of erosion risk at the base of an electric power transmission line
    de Carvalho, JC
    Pereira, JHF
    Guimaraes, RC
    dos Santos, RMM
    [J]. PROCEEDINGS OF CONFERENCE 28 - INTERNATIONAL EROSION CONTROL ASSOCIATION, 1997, 28 : 29 - 44
  • [2] A Virtual Electric Power Transmission Line Lab
    Ozkop, Emre
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING EDUCATION, 2016, 32 (05) : 2240 - 2249
  • [3] OPTIMUM ARRANGEMENT OF TOWERS IN AN ELECTRIC POWER TRANSMISSION LINE
    RANYARD, JC
    WREN, A
    [J]. COMPUTER JOURNAL, 1967, 10 (02): : 157 - &
  • [4] Risk analysis of the electric power transmission grid
    Pedersen, L. M.
    Thorstad, H. H.
    [J]. SAFETY, RELIABILITY AND RISK ANALYSIS: THEORY, METHODS AND APPLICATIONS, VOLS 1-4, 2009, : 2581 - +
  • [5] Analysis and Experimental Evaluation of Power Line Transmission Parameters for Power Line Communication
    Mlynek, P.
    Misurec, J.
    Koutny, M.
    Fujdiak, R.
    Jedlicka, T.
    [J]. MEASUREMENT SCIENCE REVIEW, 2015, 15 (02): : 64 - 71
  • [6] Power Line-Guided Automatic Electric Transmission Line Inspection System
    Xu, Chang
    Li, Qingwu
    Zhou, Qingkai
    Zhang, Shan
    Yu, Dabing
    Ma, Yunpeng
    [J]. IEEE TRANSACTIONS ON INSTRUMENTATION AND MEASUREMENT, 2022, 71
  • [7] Power Line-Guided Automatic Electric Transmission Line Inspection System
    Xu, Chang
    Li, Qingwu
    Zhou, Qingkai
    Zhang, Shan
    Yu, Dabing
    Ma, Yunpeng
    [J]. IEEE Transactions on Instrumentation and Measurement, 2022, 71
  • [8] Statistical Analysis of Transmission Line Capacties in Electric Power Grids
    Elyas, Seyyed Hamid
    Wang, Zhifang
    [J]. 2016 IEEE POWER & ENERGY SOCIETY INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE (ISGT), 2016,
  • [9] Risk assessment on electric power SDH transmission network
    Deng B.
    Tang L.
    Hao J.
    Yan J.
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2016, 40 (20): : 133 - 139
  • [10] Modeling of the transmission of power line communication signal through the power electric transformer
    M. Melit
    B. Nekhoul
    D. Sekki
    K. Kerroum
    [J]. annals of telecommunications - annales des télécommunications, 2012, 67 : 447 - 454