Canal breach risk assessment for improved asset management

被引:4
|
作者
Dun, Richard W. [1 ]
Wicks, Jon M. [2 ]
机构
[1] Water Management Canal & River Trust, Hatton, England
[2] CH2M Hill Inc, Swindon, Wilts, England
关键词
embankments; floods & floodworks; waterways & canals;
D O I
10.1680/wama.12.00060
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Advances in inundation modelling software, computer hardware and national data sets mean that it is now practical to use full solutions of the two-dimensional (2D) shallow water equations (SWE) to undertake national-scale modelling of breach inundation. Such modelling enables much improved asset management activities, which lead to reduced risk to life, lower risk of damage to properties and a much better targeting of investment by asset owners. This paper describes how a 2D SWE inundation modelling system was designed and applied to the UK Canal and River Trust canal system as part of a quantitative high-level risk assessment framework. The framework includes a new approach for estimating breach probability and hydrographs in the canal system for potential embankment and culvert failures. An innovative automated model build-and-run process using Isis 2D software was applied to model inundation in urban areas. Predicted likely loss of life and property damage outputs were used to generate a risk chart to prioritise asset inspection and maintenance.
引用
收藏
页码:5 / 16
页数:12
相关论文
共 50 条
  • [21] A note on asset management and market risk
    Scherer, Bernd
    FINANCIAL MARKETS AND PORTFOLIO MANAGEMENT, 2010, 24 (03) : 309 - 320
  • [22] Risk Asset Management of Power Grids
    Youssefi, Niloufar
    Moselhi, Osama
    CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 1628 - 1637
  • [23] Asset price bubbles and risk management
    Jarrow, Robert A.
    JOURNAL OF RISK, 2017, 20 (01): : 59 - 76
  • [24] Risk based rail asset management
    Swier, J.
    LIFE-CYCLE OF ENGINEERING SYSTEMS: EMPHASIS ON SUSTAINABLE CIVIL INFRASTRUCTURE, 2017, : 1952 - 1958
  • [25] Optimal asset allocation and risk management
    Camilleri, David
    Tahir, Mohammad Iqbal
    Wang, Samuel
    ASIAN REVIEW OF ACCOUNTING, 2005, 13 (01) : 1 - 14
  • [26] Uncertainty analysis for breach formation in the risk assessment of dams
    Niemeyer, Maren
    Huber, Nils Peter
    Köngeter, Jürgen
    Polzcyk, Herbert
    WasserWirtschaft, 2007, 97 (10) : 48 - 50
  • [27] Development of a Multi-Asset Risk Assessment Algorithm in the Context of Home Energy Management
    Ottonello, Davide
    Fermi, Alessandro
    Ravizza, Daniele
    Barbagelata, Marco
    Karatzas, Stylianos
    Chassiakos, Athanasios
    Papamanolis, Antonis
    BUILDINGS, 2023, 13 (02)
  • [28] Network Analytics for Infrastructure Asset Management Systemic Risk Assessment (vol 28, 2022)
    Goforth, Eric
    El-Dakhakhni, Wael
    Wiebe, Lydell
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2022, 28 (03)
  • [29] Market Risk Management in the Context of Engineering Asset Management
    Mare, Eben
    9TH WCEAM RESEARCH PAPERS: VOL 1: PROCEEDINGS OF 2014 WORLD CONGRESS ON ENGINEERING ASSET MANAGEMENT, 2015, : 3 - 10
  • [30] Infrastructure risk management: A probabilistic approach to asset management
    Jonkergouw, P. M. R.
    Watson, T. G.
    Erskine, A. D.
    Petrie, M.
    INTEGRATING WATER SYSTEMS, 2010, : 631 - +