Assessment on reservoir flood resources utilization of Ankang Reservoir, China

被引:9
|
作者
Lu, Shibao [1 ]
Sun, Huaping [2 ]
Sun, Dongying [3 ]
Guo, Min [1 ]
Bai, Xiao [1 ]
机构
[1] Zhejiang Univ Finance & Econ, Sch Publ Adm, Hangzhou 310018, Peoples R China
[2] Jiangsu Univ, Inst Ind Econ, Zhenjiang 212013, Jiangsu, Peoples R China
[3] Jiangsu Univ, Sch Management, Zhenjiang 212013, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Flood resources; Flood control level; Dynamic control domain; Pre-storage and pre-discharge method; WATER LEVELS; OPTIMIZATION; MANAGEMENT; CONFLICT; DEMAND; MODEL;
D O I
10.1016/j.resourpol.2020.101745
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In this paper, Ankang Reservoir is taken as the background in China, and the measured data of No. "20030920" flood is used as an example to study the utilization of reservoir flood resources. According to the reservoir water level facing the time and the implementation conditions of dynamic control, the current water and rain forecast information are referred. The pre-storage and pre-discharge method and scheduling mode of reservoir dynamic control are used to dynamically adjust the flood control level of the reservoir, and the dynamic control of the flood control level is designed. It is concluded that the dynamic control range of Ankang Reservoir is 325-327.5m, which is regarded as the constraint of real-time scheduling dynamic value for the flood control level dynamic control. This method is of important theoretical value and practical significance for safe, economical and reasonable control of the reservoir.
引用
收藏
页数:7
相关论文
共 50 条
  • [41] Multi-Reservoir Utilization Planning to Optimize Hydropower Energy and Flood Control Simultaneously
    Hamidreza Rahimi
    Mostafa K. Ardakani
    Mohamadreza Ahmadian
    Xiaonan Tang
    Environmental Processes, 2020, 7 : 41 - 52
  • [42] SIMULATING FLOOD ROUTING THROUGH A RESERVOIR
    HAMDY, MY
    CURRY, RB
    AGRICULTURAL ENGINEERING, 1970, 51 (11): : 654 - &
  • [43] A FLOOD DEPOSIT IN AN EMPTIED SCOTTISH RESERVOIR
    DUCK, RW
    MCMANUS, J
    SCOTTISH GEOGRAPHICAL MAGAZINE, 1988, 104 (03): : 167 - 170
  • [44] A stochastic model for reservoir flood operation
    Cruise, JF
    Singh, VP
    CIVIL ENGINEERING SYSTEMS, 1996, 13 (02): : 141 - 155
  • [45] Flood routing on a reservoir: Hydrologic or hydraulic?
    Antonio Hernandez-Andrade, Juan
    Ignacio Martinez-Martinez, Sergio
    TECNOLOGIA Y CIENCIAS DEL AGUA, 2019, 10 (06) : 147 - 177
  • [46] Holistic planning of a flood control reservoir
    Kueenzlen, Juergen H. R.
    Lind, Dieter
    BAUTECHNIK, 2013, 90 (06) : 367 - 375
  • [47] The Detection of Flood Characteristics Alteration Induced by the Danjiangkou Reservoir at Han River, China
    Zhang, Xiao
    Feng, Baofei
    Zhang, Jun
    Xu, Yinshan
    Li, Jie
    Niu, Wenjing
    Yang, Yanfei
    WATER, 2021, 13 (04)
  • [48] A computation model for estimating the input flood of the Feilaixia reservoir in Guangdong, south China
    Chen, Junhe
    Liu, Haiyang
    Chen, Xiaoyue
    GIS AND REMOTE SENSING IN HYDROLOGY, WATER RESOURCES AND ENVIRONMENT, 2004, 289 : 59 - 65
  • [49] Integrated Reservoir Management System for Flood Risk Assessment Under Climate Change
    Eum, Hyung-Il
    Vasan, A.
    Simonovic, Slobodan P.
    WATER RESOURCES MANAGEMENT, 2012, 26 (13) : 3785 - 3802
  • [50] A Probabilistic Approach for Off-Stream Reservoir Failure Flood Hazard Assessment
    Sanz-Ramos, Marcos
    Blade, Ernest
    Silva-Cancino, Nathalia
    Salazar, Fernando
    Lopez-Gomez, David
    Martinez-Gomariz, Eduardo
    WATER, 2023, 15 (12)