Lean Control for Make-to-Order Companies: Integrating Customer Enquiry Management and Order Release

被引:62
|
作者
Thuerer, Matthias [1 ]
Stevenson, Mark [2 ]
Silva, Cristovao [3 ]
Land, Martin J. [4 ]
Fredendall, Lawrence D. [5 ]
Melnyk, Steven A. [6 ]
机构
[1] Univ Fed Sao Carlos, Dept Ind Engn, BR-13565905 Sao Carlos, SP, Brazil
[2] Univ Lancaster, Dept Management Sci, Sch Management, Lancaster LA1 4YX, England
[3] CEMUC Univ Coimbra, Dept Mech Engn, P-3030 Coimbra, Portugal
[4] Univ Groningen, Fac Econ & Business, Dept Operat, NL-9700 AV Groningen, Netherlands
[5] Clemson Univ, Dept Management, Clemson, SC 29634 USA
[6] Michigan State Univ, Eli Broad Sch Business, E Lansing, MI 48824 USA
基金
巴西圣保罗研究基金会;
关键词
workload control; lean; make-to-order; customer enquiry management; order review and release; DATE SETTING RULES; WORKLOAD CONTROL; JOB SHOPS; PERFORMANCE; TIMES;
D O I
10.1111/poms.12058
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A lead time that is short, predictable, and reliable is an increasingly important criterion in supplier selection. Although many companies may achieve this through lean implementation, high-variety manufacturers, for example, small and medium-sized make-to-order companies, have found that lean's planning and control techniques do not apply. This article outlines a planning and control concept known as workload control (WLC) that integrates customer enquiry management, including a due-date setting rule, with order release control. Simulation is then used to assess its impact on shop performance. Results demonstrate that an integrated WLC concept can reduce the percentage of tardy jobsso short lead times can be realistically quotedwhile also reducing and stabilizing workloads. WLC can level demand and production over time when work is not standardized and it is not possible to synchronize flows on the shop floor. Results are shown to be robust to changes in routing characteristics, the mix of orders with due dates specified by the customer and proposed internally, and the strike rate (or order-winning probability). Hence, an integrated approach to WLC represents an important step toward achieving lean in make-to-order companies.
引用
收藏
页码:463 / 476
页数:14
相关论文
共 50 条
  • [41] Order acceptance and scheduling decisions in make-to-order systems
    Oguz, Ceyda
    Salmon, F. Sibel
    Yalcin, Zehra Bilgintuerk
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 125 (01) : 200 - 211
  • [42] A Order Mix Decision Model for Make-To-Order Enterprise
    Wang Chao
    2009 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (16TH), VOLS I AND II, CONFERENCE PROCEEDINGS, 2009, : 541 - 546
  • [43] A two-stage bid-price control for make-to-order revenue management
    Volling, Thomas
    Akyol, Derya Eren
    Wittek, Kai
    Spengler, Thomas S.
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (05) : 1021 - 1032
  • [44] Make-to-order manufacturing - new approach to management of manufacturing processes
    Saniuk, A.
    Waszkowski, R.
    MODTECH INTERNATIONAL CONFERENCE - MODERN TECHNOLOGIES IN INDUSTRIAL ENGINEERING IV, PTS 1-7, 2016, 145
  • [45] Simulation study of availability management in a make-to-order manufacturing environment for a differentiated order system
    Kim, Gyu C.
    Schniederjans, Marc J.
    Kim, Stacy S.
    PRODUCTION PLANNING & CONTROL, 2010, 21 (01) : 47 - 69
  • [46] Customized orders management in connected make-to-order supply chains
    Gholami, Amirhosein
    Nezamoddini, Nasim
    Khasawneh, Mohammad T.
    OPERATIONS MANAGEMENT RESEARCH, 2023, 16 (03) : 1428 - 1443
  • [47] The Role of Commitments in the Management of Construction Make-to-Order Supply Chains
    Isatto, Eduardo L.
    Azambuja, Marcelo
    Formoso, Carlos T.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (04)
  • [48] Revenue management for a make-to-order company with limited inventory capacity
    Florian Defregger
    Heinrich Kuhn
    OR Spectrum, 2007, 29 : 137 - 156
  • [49] Revenue management for a make-to-order company with limited inventory capacity
    Defregger, Florian
    Kuhn, Heinrich
    OR SPECTRUM, 2007, 29 (01) : 137 - 156
  • [50] Raw material release time control for complex make-to-order products with stochastic processing times
    Song, Dong-Ping
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 103 (01) : 371 - 385