A Multi-Objective Model of Integrated Collaborative Planning and Scheduling for Dual-Resource and Its Algorithm

被引:1
|
作者
Wang, Weizhong [1 ]
Ma, Chencheng [1 ]
Bao, Zhenqiang [1 ]
Ren, Xiaoqing [1 ]
机构
[1] Yangzhou Univ, Informat Engeering Coll, Yangzhou, Jiangsu, Peoples R China
关键词
component; dual-resource; collaborative planning; multi-objective; scheduling; SPEA2;
D O I
10.1109/IHMSC.2016.154
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Since that collaborative plan, manufacturing plan and scheduling solutions are hard to be paralleled and synchronized, after considering the scheduling with collaborative plan under the circumstance of supply chain, the multi-objective model of integrated collaborative planning and scheduling for dual-resource is established, which contains two resource constraints: the machines and workers. The model achieves three goals: the shortest completion time, the lowest cost and the minimum total tardiness. Then, an improved SPEA2 is proposed for the model. In this algorithm, the chromosome pair encoding which is suitable for the requirements of dual-resource and collaborative decision is designed. It includes process coding, machine coding, worker coding and collaborative decision variate, and the crossover operation and mutation operation of chromosome are improved. Finally, the correctness of model and the efficiency of algorithm are proved by simulation experiment.
引用
收藏
页码:400 / 403
页数:4
相关论文
共 50 条
  • [12] Local search with controlled deterioration for multi-objective scheduling in dual-resource constrained flexible job shop
    Lei, Deming
    Tan, Xianfeng
    [J]. PROCEEDINGS OF THE 28TH CHINESE CONTROL AND DECISION CONFERENCE (2016 CCDC), 2016, : 4921 - 4926
  • [13] FIREFLY ALGORITHM HYBRIDIZED WITH GENETIC ALGORITHM FOR MULTI-OBJECTIVE INTEGRATED PROCESS PLANNING AND SCHEDULING
    Ri, Kwang-won
    Mun, Kyong-ho
    [J]. JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2024, 20 (07) : 2310 - 2328
  • [14] Multi-objective Order Planning Model and Algorithm for Integrated Steel Production
    Yu Chun-yue
    Qu Rong-xia
    [J]. 2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (15TH), VOLS I AND II, CONFERENCE PROCEEDINGS, 2008, : 400 - 405
  • [15] Multi-objective integrated planning and scheduling model for operating rooms under uncertainty
    Ansarifar, Javad
    Tavakkoli-Moghaddam, Reza
    Akhavizadegan, Faezeh
    Amin, Saman Hassanzadeh
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART H-JOURNAL OF ENGINEERING IN MEDICINE, 2018, 232 (09) : 930 - 948
  • [16] A Priority Based Optimization Algorithm for Multi-objective Integrated Process Planning and Scheduling Problem
    Ausaf, Muhammad Farhan
    Li, Xinyu
    Liang, Gao
    [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 1327 - 1331
  • [17] Multi-objective genetic algorithm for integrated process planning and scheduling with fuzzy processing time
    Wen, Xiaoyu
    Li, Xinyu
    Gao, Liang
    Wan, Liang
    Wang, Wenwen
    [J]. 2013 SIXTH INTERNATIONAL CONFERENCE ON ADVANCED COMPUTATIONAL INTELLIGENCE (ICACI), 2013, : 293 - 298
  • [18] An effective multi-objective genetic algorithm based on immune principle and external archive for multi-objective integrated process planning and scheduling
    Guofu Luo
    Xiaoyu Wen
    Hao Li
    Wuyi Ming
    Guizhong Xie
    [J]. The International Journal of Advanced Manufacturing Technology, 2017, 91 : 3145 - 3158
  • [19] An effective multi-objective genetic algorithm based on immune principle and external archive for multi-objective integrated process planning and scheduling
    Luo, Guofu
    Wen, Xiaoyu
    Li, Hao
    Ming, Wuyi
    Xie, Guizhong
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2017, 91 (9-12): : 3145 - 3158
  • [20] An Effective Genetic Algorithm for Multi-objective Integrated Process Planning and Scheduling with Various Flexibilities in Process Planning
    Li, Xinyu
    Wen, Xiaoyu
    Gao, Liang
    [J]. JOURNAL OF UNIVERSAL COMPUTER SCIENCE, 2014, 20 (14) : 1926 - 1950