共 50 条
- [2] Greedy Tree Growing Heuristics on Block-Test Scheduling Under Power Constraints [J]. Journal of Electronic Testing, 2004, 20 : 61 - 78
- [3] Greedy tree growing heuristics on block-test scheduling under power constraints [J]. JOURNAL OF ELECTRONIC TESTING-THEORY AND APPLICATIONS, 2004, 20 (01): : 61 - 78
- [4] Energy Efficient Data Center Management Under Availability Constraints [J]. 2015 9TH ANNUAL IEEE INTERNATIONAL SYSTEMS CONFERENCE (SYSCON), 2015, : 377 - 381
- [6] Reliability evaluation of airport power systems under operative constraints [J]. 2006 INTERNATIONAL SYMPOSIUM ON POWER ELECTRONICS, ELECTRICAL DRIVES, AUTOMATION AND MOTION, VOLS 1-3, 2006, : 852 - +
- [7] Evaluation of Heuristics for Product Data Models [J]. BUSINESS PROCESS MANAGEMENT WORKSHOPS, BPM 2020 INTERNATIONAL WORKSHOPS, 2020, 397 : 355 - 366
- [8] Energy Saving Heuristics for Optimization of Cloud Data Center [J]. PROCEEDINGS OF THE 2019 8TH INTERNATIONAL CONFERENCE ON SYSTEM MODELING & ADVANCEMENT IN RESEARCH TRENDS (SMART-2019), 2019, : 48 - 54
- [9] PowerFCT: Power Optimization of Data Center Network with Flow Completion Time Constraints [J]. 2015 IEEE 29TH INTERNATIONAL PARALLEL AND DISTRIBUTED PROCESSING SYMPOSIUM (IPDPS), 2015, : 334 - 343