Single-Machine Scheduling with Due-Window Assignment and Rate-Modifying-Activities under a Deteriorating Maintenance

被引:1
|
作者
Luo, Chengxin [1 ]
机构
[1] Shenyang Normal Univ, Sch Math & Syst Sci, Shenyang 110034, Peoples R China
关键词
Scheduling; Due-Window Assignment; Rate-Modifying Activity; Maintenance Activity; SUBJECT; JOBS;
D O I
10.4028/www.scientific.net/AMM.278-280.2248
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper studies single-machine scheduling problems with a due-window assignment and a rate-modifying activity under a deteriorating maintenance consideration simultaneously. Jobs completed within the due-window incur no penalties, other jobs incur either earliness or tardiness penalties. The maintenance activity can be scheduled immediately after any one of the completed jobs. We assume that once the maintenance activity has been completed, the machine efficiency will be improved and the machine maintenance duration depends on its starting time. The objective is to find the optimal maintenance position as well as the optimal size and location of the due-window, and the sequence of jobs to minimize a cost function based on the window size and window location and the earliness and tardiness of the jobs. We propose a polynomial time algorithm to solve the problem optimally.
引用
收藏
页码:2248 / 2251
页数:4
相关论文
共 50 条
  • [41] Single-Machine Scheduling with Upper Bounded Maintenance Time under the Deteriorating Effect
    Xue, Pengfei
    Zhang, Yulin
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2013, 2013
  • [42] Single-machine scheduling with a common due window
    Yeung, WK
    Oguz, C
    Cheng, TCE
    COMPUTERS & OPERATIONS RESEARCH, 2001, 28 (02) : 157 - 175
  • [43] Due-window assignment and scheduling with general position-dependent processing times involving a deteriorating and compressible maintenance activity
    Zhu, Hui
    Li, Min
    Zhou, Zhangjin
    You, Yun
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (12) : 3475 - 3490
  • [44] Single-machine slack due-window assignment and scheduling with past-sequence-dependent delivery times and controllable job processing times
    Ji, Min
    Yao, Danli
    Ge, Jiaojiao
    Cheng, T. C. E.
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2015, 9 (06) : 794 - 818
  • [45] Single-machine common due-window assignment and scheduling with position-dependent weights, delivery time, learning effect and resource allocations
    Qian, Jin
    Chang, Guisong
    Zhang, Xue
    JOURNAL OF APPLIED MATHEMATICS AND COMPUTING, 2024, 70 (03) : 1965 - 1994
  • [46] Common due-window assignment and minmax scheduling with resource allocation and group technology on a single machine
    Ren, Junfeng
    Yang, Yang
    ENGINEERING OPTIMIZATION, 2022, 54 (11) : 1819 - 1834
  • [47] On single-machine scheduling with flexible maintenance activities
    Xu, Dehua
    Yin, Yunqiang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1139 - 1145
  • [48] On single-machine scheduling with flexible maintenance activities
    Dehua Xu
    Yunqiang Yin
    The International Journal of Advanced Manufacturing Technology, 2011, 56 : 1139 - 1145
  • [49] Single-machine batch delivery scheduling and common due-date assignment with a rate-modifying activity
    Yin, Yunqiang
    Cheng, T. C. E.
    Wu, Chin-Chia
    Cheng, Shuenn-Ren
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (19) : 5583 - 5596
  • [50] Bi-criterion single-machine scheduling and due-window assignment with common flow allowances and resource-dependent processing times
    Yin, Yunqiang
    Wang, Du-Juan
    Cheng, T. C. E.
    Wu, Chin-Chia
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2016, 67 (09) : 1169 - 1183