An approximate cost estimation model based on standard quantities of steel box girder bridge substructure

被引:2
|
作者
Oh, Chi Don [1 ]
Park, Chansik [1 ]
Kim, Kyong Ju [2 ]
机构
[1] Chung Ang Univ, Sch Architecture & Bldg Sci, Seoul 156756, South Korea
[2] Chung Ang Univ, Dept Civil & Environm Engn, Seoul 156756, South Korea
关键词
steel box girder bridge; approximate cost estimating; quantity of standard work; major work item; major cross section; GENETIC ALGORITHMS; NEURAL-NETWORKS; REGRESSION; BUILDINGS; PROJECTS; BEAM;
D O I
10.1007/s12205-013-0287-z
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cost estimation during early stages of construction should be swift and accurate. However, approximate estimation of the costs of bridge construction in Korea is flawed because it is calculated using average construction costs per length or area and do not reflect bridge characteristics. For quick and accurate cost estimates of the substructure of steel box girder bridges with minimum input data, this study proposes an approximate cost estimate model that is based on standard quantities of major work items. The data for 52 steel box girder bridges in Korea were collected. 42 bridges were analyzed for the model development and 10 for validation. Five major work items were identified that accounted for 80% or more of construction costs. The developed estimation model utilizes only six input data: overall height of the bridge abutment, number of piers, overall height of piers, types and numbers of bridge shoes, number of locations where steel pipes are used, and length of steel pipe. It shows an error range of -5.78% through +3.93%.
引用
收藏
页码:877 / 885
页数:9
相关论文
共 50 条
  • [31] Model test for fatigue performance of anchorage in cable-stayed bridge with steel box girder
    School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China
    不详
    Gongcheng Lixue, 2007, 8 (127-132): : 127 - 132
  • [32] TESTING OF A MODEL CURVED STEEL GIRDER BRIDGE
    CLARKE, CB
    ENGINEERING JOURNAL-AMERICAN INSTITUTE OF STEEL CONSTRUCTION INC, 1966, 3 (03): : 106 - &
  • [33] Development of an Environmental Load Estimation Model in the Planning Stage of Steel Box Girder Bridges
    Jeon, Min-Yeong
    Kyung, Kab-Soo
    Lee, Sung-Jin
    Park, Jin-Eun
    INTERNATIONAL JOURNAL OF STEEL STRUCTURES, 2018, 18 (01) : 69 - 78
  • [34] Key Design Techniques for Steel Box Girder in Navigational Channel Bridge of Yushan Bridge
    Li, Lei
    Wang, Chang-Jiang
    Chen, Xiang-Yang
    Bai, Yu-Dong
    Bridge Construction, 2019, 49 (05): : 79 - 84
  • [35] Development of an Environmental Load Estimation Model in the Planning Stage of Steel Box Girder Bridges
    Min-Yeong Jeon
    Kab-Soo Kyung
    Sung-Jin Lee
    Jin-Eun Park
    International Journal of Steel Structures, 2018, 18 : 69 - 78
  • [36] Calculation and Analysis of Construction Process of Steel Box Girder of Main Bridge of Xiushan Bridge
    Li, Ou
    Huang, Xiang-Dong
    Yuan, Jian-Xin
    Dong, Xiao-Bing
    Bridge Construction, 2019, 49 (01) : 107 - 112
  • [37] Bridge management strategy for a steel plate girder bridge based on minimum total life cycle cost
    Kaito, K
    Abe, M
    Koide, Y
    Fujino, Y
    HEALTH MONITORING AND MANAGEMENT OF CIVIL INFRASTRUCTURE SYSTEMS, 2001, 4337 : 194 - 202
  • [38] Experimental study on optimization of continuous steel box girder bridge deck
    Zhang, Chao
    Sun, Quansheng
    Kong, Dandan
    Hu, Bowen
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2024, 23 (04) : 1250 - 1264
  • [39] Load Testing a Double-Composite Steel Box Girder Bridge
    Stroh, Steven L.
    Sen, Rajan
    Ansley, Marcus
    TRANSPORTATION RESEARCH RECORD, 2010, (2200) : 36 - 42
  • [40] Geometry Control of The Steel Box Girder of Jiashao Bridge at The Fabrication Stage
    Jia, Shao-min
    Zhao, Lei
    Gu, Xiang
    ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1255 - 1259