An approximate cost estimation model based on standard quantities of steel box girder bridge substructure

被引:2
|
作者
Oh, Chi Don [1 ]
Park, Chansik [1 ]
Kim, Kyong Ju [2 ]
机构
[1] Chung Ang Univ, Sch Architecture & Bldg Sci, Seoul 156756, South Korea
[2] Chung Ang Univ, Dept Civil & Environm Engn, Seoul 156756, South Korea
关键词
steel box girder bridge; approximate cost estimating; quantity of standard work; major work item; major cross section; GENETIC ALGORITHMS; NEURAL-NETWORKS; REGRESSION; BUILDINGS; PROJECTS; BEAM;
D O I
10.1007/s12205-013-0287-z
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cost estimation during early stages of construction should be swift and accurate. However, approximate estimation of the costs of bridge construction in Korea is flawed because it is calculated using average construction costs per length or area and do not reflect bridge characteristics. For quick and accurate cost estimates of the substructure of steel box girder bridges with minimum input data, this study proposes an approximate cost estimate model that is based on standard quantities of major work items. The data for 52 steel box girder bridges in Korea were collected. 42 bridges were analyzed for the model development and 10 for validation. Five major work items were identified that accounted for 80% or more of construction costs. The developed estimation model utilizes only six input data: overall height of the bridge abutment, number of piers, overall height of piers, types and numbers of bridge shoes, number of locations where steel pipes are used, and length of steel pipe. It shows an error range of -5.78% through +3.93%.
引用
收藏
页码:877 / 885
页数:9
相关论文
共 50 条
  • [1] An approximate cost estimation model based on standard quantities of steel box girder bridge substructure
    Chi Don Oh
    Chansik Park
    Kyong Ju Kim
    KSCE Journal of Civil Engineering, 2013, 17 : 877 - 885
  • [2] Optimal design of a steel box girder bridge considering life cycle cost
    Yung Seok Shin
    Jang Ho Park
    Dong-Ho Ha
    KSCE Journal of Civil Engineering, 2009, 13 : 433 - 440
  • [3] Optimal design of a steel box girder bridge considering life cycle cost
    Shin, Yung Seok
    Park, Jang Ho
    Ha, Dong-Ho
    KSCE JOURNAL OF CIVIL ENGINEERING, 2009, 13 (06) : 433 - 440
  • [4] STEEL BOX GIRDER MAKES HANDSOME BRIDGE
    SHEDD, JP
    CIVIL ENGINEERING, 1973, 43 (05): : 67 - 69
  • [5] Thermal actions on steel box girder bridge
    Lucas, JM
    Berred, A
    Louis, C
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-STRUCTURES AND BUILDINGS, 2003, 156 (02) : 175 - 182
  • [6] Externally Prestressed Steel Box Girder Bridge
    Yang, Jingnan
    He, Xiongjun
    Yang, Xiaocheng
    SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 2209 - +
  • [7] STRUCTURAL MODEL UPDATING OF STEEL BOX GIRDER BRIDGE USING MODAL FLEXIBILITY BASED DEFLECTIONS
    Cui, Jintao
    Kim, Dookie
    Koo, Ki Young
    Chaudhary, Sandeep
    BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2012, 7 (04): : 253 - 260
  • [8] Cost comparison of steel plate girder and RCC girder bridge
    Zain, Mohd
    Varma, Rakesh
    Srivastava, Rajendra Kumar
    MATERIALS TODAY-PROCEEDINGS, 2022, 56 : 2274 - 2277
  • [9] RESIDUAL STRESSES IN A STEEL BOX GIRDER BRIDGE.
    Ogle, M.H.
    Technical Note - CIRIA (Construction Industry Research and Information Association), 1982,
  • [10] PRESTRESSED SANDWICH DIAPHRAGM IN STEEL BOX GIRDER BRIDGE
    WALLACE, A
    LEE, DJ
    CONCRETE, 1974, 8 (04): : 62 - 62