共 50 条
- [41] Experimental study on clogging of cutterhead for panel earth-pressure-balance shield tunneling in cohesive strata Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2020, 42 (09): : 1651 - 1658
- [42] Design and construction of a tunnel using the technology for controlling muck flow in the cutting chamber of an earth pressure balance shield of large cross section UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 427 - 433
- [43] Realization of earth pressure balance for shield tunnelling machine Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2006, 40 (05): : 874 - 877
- [46] Modeling approaches to pressure balance dynamic system in shield tunneling Journal of Central South University, 2014, 21 : 1206 - 1216
- [47] Controlling earth pressure of head chamber of earth pressure balance(EPB) shield machine Meitan Xuebao/Journal of the China Coal Society, 2010, 35 (03): : 402 - 405
- [48] Study on loosening earth pressure in sandy ground for shield tunneling Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2014, 50 (21): : 17 - 22
- [49] Optimal control of earth pressure balance of shield tunneling machine based on dual-heuristic dynamic programming OPTIMAL CONTROL APPLICATIONS & METHODS, 2020, 41 (05): : 1510 - 1523