A list-scheduling heuristic for the short-term planning of assessment centers

被引:5
|
作者
Zimmermann, Adrian [1 ]
Trautmann, Norbert [1 ]
机构
[1] Univ Bern, Dept Business Adm, Bern, Switzerland
关键词
Real-world application; Human resource management; Assessment center; List scheduling; Multi-pass heuristic; LABOR CONSTRAINTS; RESOURCE; TIME; PROJECTS;
D O I
10.1007/s10951-017-0521-5
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Many companies operate assessment centers to help them select candidates for open job positions. During the assessment process, each candidate performs a set of tasks, and the candidates are evaluated by some so-called assessors. Additional constraints such as preparation and evaluation times, actors' participation in tasks, no-go relationships, and prescribed time windows for lunch breaks contribute to the complexity of planning such assessment processes. We propose a multi-pass list-scheduling heuristic for this novel planning problem; to this end, we develop novel procedures for devising appropriate scheduling lists and for generating a feasible schedule. The computational results for a set of example problems that represent or are derived from real cases indicate that the heuristic generates optimal or near-optimal schedules within relatively short CPU times.
引用
收藏
页码:131 / 142
页数:12
相关论文
共 50 条
  • [41] SHORT-TERM SCHEDULING OF PIPELESS BATCH PLANTS
    PANTELIDES, CC
    REALFF, MJ
    SHAH, N
    CHEMICAL ENGINEERING RESEARCH & DESIGN, 1995, 73 (A4): : 431 - 444
  • [42] SHORT-TERM SCHEDULING OF REACTIVE POWER CONTROLLERS
    HONG, YY
    LIAO, CM
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1995, 10 (02) : 860 - 868
  • [43] Short-term scheduling of combined cycle units
    Lu, B
    Shahidehpour, M
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (03) : 1616 - 1625
  • [44] Short-term scheduling of a polymer compounding plant
    Castro, P
    Barbosa-Póvoa, APFD
    Matos, H
    EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING - 12, 2002, 10 : 649 - 654
  • [45] A Review of Short-Term Hydro Scheduling Tools
    Osorio, G. J.
    Matias, J. C. O.
    Catalao, J. P. S.
    2013 48TH INTERNATIONAL UNIVERSITIES' POWER ENGINEERING CONFERENCE (UPEC), 2013,
  • [46] EFFECT OF INTERCHANGE ON SHORT-TERM HYDROTHERMAL SCHEDULING
    WU, RN
    LEE, TH
    HILL, EF
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (03) : 1217 - 1223
  • [47] SHORT-TERM GENERATION SCHEDULING WITH SECURITY CONSTRAINTS
    BRANNLUND, H
    SJELVGREN, D
    BUBENKO, JA
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (01) : 310 - 316
  • [48] Short-term maintenance scheduling for utility systems
    Matsuoka, Shinobu
    Muraki, Masaaki
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2007, 13 (03) : 228 - +
  • [49] Short-term scheduling of pipeless batch plants
    Pantelides, C.C.
    Realff, M.J.
    Shah, N.
    Chemical Engineering Research and Design, 1995, 73 (A4): : 431 - 444
  • [50] Short-term scheduling for multipurpose batch plants
    Sun, Peng
    Chen, Chang-Ling
    Han, Zheng-Zhi
    Kongzhi yu Juece/Control and Decision, 2002, 17 (SUPPL.): : 685 - 689