A list-scheduling heuristic for the short-term planning of assessment centers

被引:5
|
作者
Zimmermann, Adrian [1 ]
Trautmann, Norbert [1 ]
机构
[1] Univ Bern, Dept Business Adm, Bern, Switzerland
关键词
Real-world application; Human resource management; Assessment center; List scheduling; Multi-pass heuristic; LABOR CONSTRAINTS; RESOURCE; TIME; PROJECTS;
D O I
10.1007/s10951-017-0521-5
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Many companies operate assessment centers to help them select candidates for open job positions. During the assessment process, each candidate performs a set of tasks, and the candidates are evaluated by some so-called assessors. Additional constraints such as preparation and evaluation times, actors' participation in tasks, no-go relationships, and prescribed time windows for lunch breaks contribute to the complexity of planning such assessment processes. We propose a multi-pass list-scheduling heuristic for this novel planning problem; to this end, we develop novel procedures for devising appropriate scheduling lists and for generating a feasible schedule. The computational results for a set of example problems that represent or are derived from real cases indicate that the heuristic generates optimal or near-optimal schedules within relatively short CPU times.
引用
收藏
页码:131 / 142
页数:12
相关论文
共 50 条
  • [1] A list-scheduling heuristic for the short-term planning of assessment centers
    Adrian Zimmermann
    Norbert Trautmann
    Journal of Scheduling, 2018, 21 : 131 - 142
  • [2] A decomposition heuristic for short-term planning of assessment centres
    Rihm, Tom
    Trautmann, Norbert
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2017, 11 (06) : 725 - 751
  • [3] Cone-based clustering heuristic for list-scheduling algorithms
    Govindarajan, S
    Vemuri, R
    EUROPEAN DESIGN & TEST CONFERENCE - ED&TC 97, PROCEEDINGS, 1997, : 456 - 462
  • [4] A SHORT-TERM PRODUCTION PLANNING AND SCHEDULING MODEL
    POURBABAI, B
    ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 18 (02): : 159 - 167
  • [5] Meta heuristic search algorithms for short-term hydrothermal scheduling
    Sinha, Nidul
    Lai, Loi-Lei
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2006, : 4050 - +
  • [6] A Heuristic Approach for Short-Term Operations Planning in a Catering Company
    Farahani, P.
    Grunow, M.
    Guenther, H. O.
    2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 1131 - 1135
  • [7] Improving short-term planning by incorporating scheduling consequences
    Heijnen, P
    Bouwmans, I
    Verwater-Lukszo, Z
    European Symposium on Computer-Aided Process Engineering-15, 20A and 20B, 2005, 20a-20b : 997 - 1002
  • [8] Optimization tool for short-term production planning and scheduling
    Jozefowska, J.
    Zimniak, A.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (01) : 109 - 120
  • [9] Planning and scheduling of parallel semicontinuous processes .2. Short-term scheduling
    Karimi, IA
    McDonald, CM
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1997, 36 (07) : 2701 - 2714
  • [10] Planning and scheduling of parallel semicontinuous processes. 2. Short-term scheduling
    Karimi, Iftekhar A.
    McDonald, Conor M.
    Industrial and Engineering Chemistry Research, 1997, 36 (07): : 2701 - 2714