Decentralized Multi-Project Scheduling via Multi-Unit Combinatorial Auction

被引:0
|
作者
Song, Wen [1 ]
Kang, Donghun [1 ]
Zhang, Jie [2 ]
Xi, Hui [3 ]
机构
[1] Nanyang Technol Univ, Rolls Royce NTU Corp Lab, Singapore, Singapore
[2] Nanyang Technol Univ, Sch Comp Engn, Singapore, Singapore
[3] Rolls Royce Singapore Pte Ltd, Singapore, Singapore
基金
新加坡国家研究基金会;
关键词
Multi-Project Scheduling; Multi-Unit Combinatorial Auction; Resource Allocation; SYSTEM; CHAINS;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In industry, many problems are considered as the Decentralized Resource-Constrained Multi-Project Scheduling Problem (DRCMPSP). Existing approaches encounter difficulties in dealing with large problems while preserving information privacy of project agents. In this paper, we propose a novel approach to solve DRCMPSP based on the multi-unit combinatorial auction, which can efficiently solve the problem without violating information privacy. It adopts a greedy resource allocation strategy with fixed resource cost to simplify computation required for project (bidder) and auctioneer agents. In addition, a bid modification step is incorporated to allow project agents to better utilize resources. Analysis and empirical results indicate that our approach outperforms state-of-the-art decentralized approaches in minimizing average project delay, and scales well to large problems with thousands of activities from tens of projects.
引用
收藏
页码:836 / 844
页数:9
相关论文
共 50 条
  • [41] An Online Multi-unit Auction with Improved Competitive Ratio
    Chakraborty, Sourav
    Devanur, Nikhil
    INTERNET AND NETWORK ECONOMICS, PROCEEDINGS, 2009, 5929 : 79 - +
  • [42] Multi-unit auction model based on loss aversion
    Xiong, Guoqiang
    Zhang, Chunsheng
    FIRST INTERNATIONAL WORKSHOP ON KNOWLEDGE DISCOVERY AND DATA MINING, PROCEEDINGS, 2007, : 274 - +
  • [43] MULTI-PROJECT SCHEDULING WITH EXPLICIT LATENESS COSTS
    KIM, SY
    LEACHMAN, RC
    IIE TRANSACTIONS, 1993, 25 (02) : 34 - 44
  • [44] Constraints based scheduling in the multi-project environment
    Skolud, Bozena
    Zientek, Aleksandra
    Computer Assisted Mechanics and Engineering Sciences, 2005, 12 (2-3): : 247 - 257
  • [45] Multi-project scheduling with explicit lateness costs
    Leachman, Robert C.
    IIE Transactions (Institute of Industrial Engineers), 1993, 25 (02): : 34 - 44
  • [46] Practical application of a multi-project scheduling heuristic
    Bowers, Melissa R.
    Groom, Kevin
    Morris, Robert
    Production and Inventory Management Journal, 37 (04): : 19 - 25
  • [47] Polynomial algorithms for clearing multi-unit single-item and multi-unit combinatorial reverse auctions
    Dang, VD
    Jennings, NR
    ECAI 2002: 15TH EUROPEAN CONFERENCE ON ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2002, 77 : 23 - 27
  • [48] Robust Competence Allocation for Multi-project Scheduling
    Bocewicz, Grzegorz
    Wikarek, Jaroslaw
    Sitek, Pawel
    Banaszak, Zbigniew
    INFORMATION SYSTEMS ARCHITECTURE AND TECHNOLOGY, ISAT 2019, PT II, 2020, 1051 : 16 - 30
  • [49] Collaborative evolutionary multi-project resource scheduling
    Shackelford, M
    Corne, D
    PROCEEDINGS OF THE 2001 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1 AND 2, 2001, : 1131 - 1138
  • [50] Smart multi-project scheduling and multi-skilled workforce assignment for prefabricated bathroom unit production
    Han, Jinchi
    Chen, Chen
    Tiong, Robert Lee Kong
    Wu, Kan
    AUTOMATION IN CONSTRUCTION, 2024, 166