Aggregate social discount rate derived from individual discount rates

被引:12
|
作者
Reinschmidt, KF [1 ]
机构
[1] Texas A&M Univ, Dept Civil Engn, Construct Geotech & Struct Div, College Stn, TX 77843 USA
关键词
social discount rate; public sector investment; benefit-cost analysis;
D O I
10.1287/mnsc.48.2.307.259
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In the economic evaluation of large public-sector projects, an aggregate social discount rate may be used in present worth comparison of alternatives. This paper uses the assumptions that individual discount rates are constant over time and approximately Normally distributed across the affected population, with mean mu and variance sigma(2), to derive an aggregate discount function that is exponential in form but with time-dependent aggregate discount rate p(t) = mu - sigma(2)t/2, where t is the time of occurrence of the cost or benefit. This equation agrees with numerical simulations. If sigma(2) > 0, then the aggregate discount rate is less than the mean individual discount rate, and use of the time-dependent aggregate discount rate p(t) = mu - sigma(2)t/2 instead of the constant discount factor p(t) = mu would result in larger discounted present values for public-sector projects for which the benefits lie far in the future. This could mean that public-sector investments that would be rejected under the assumption p(t) = mu might be justified using the time-dependent aggregate discount rate p(t) = mu - sigma(2)t/2.
引用
收藏
页码:307 / 312
页数:6
相关论文
共 50 条