A novel precedence-based and heuristic approach for short-term scheduling of multipurpose batch plants

被引:13
|
作者
Pan, Ming [1 ]
Qian, Yu [1 ]
Li, Xiuxi [1 ]
机构
[1] S China Univ Technol, Sch Chem Engn, Guangzhou 510640, Guangdong, Peoples R China
基金
中国国家自然科学基金;
关键词
scheduling; multipurpose; batch plants; MILP; precedence-based; heuristic rules;
D O I
10.1016/j.ces.2008.05.046
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Many continuous-time formulations have been proposed during the last decades for short-term scheduling of multipurpose batch plants. Although these models establish advantages over discrete-time representations, they are still inefficient in solving moderate-size problems, such as maximization of profit in long horizon, and minimization of makespan. Unlike existing literature, this paper presents a new precedencebased mixed integer linear programming (MILP) formulation for short-term scheduling of multipurpose batch plants. In the new model, multipurpose batch plants are described with a modified state-task network (STN) approach, and binary variables express the assignments and sequences of batch processing and storing. To eliminate the drawback of precedence-based formulations which commonly include large numbers of batches, an iterative procedure is developed to determine the appropriate number of batch that leads to global optimal solution. Moreover, four heuristic rules are proposed to selectively prefix some binary variables to 0 or 1, thereby reducing the overall number of binary variables significantly. To evaluate model performance, our model and the best models reported in the literature (S&K model and I&F model) are utilized to solve several benchmark examples. The result comparison shows that our model is more effective to find better solution for complex problems when using heuristic rules. Note that our approach not only can handle unlimited intermediate storage efficiently as well as the I&F model, but also can solve scheduling problems in limited intermediate storage more quickly than the S&K model. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:4313 / 4332
页数:20
相关论文
共 50 条
  • [21] An Efficient Global Event-Based Continuous-Time Formulation for the Short-Term Scheduling of Multipurpose Batch Plants
    Gimenez, Diego M.
    Henning, Gabriela P.
    17TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2007, 24 : 661 - 666
  • [22] Comments on "An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants"
    Ierapetritou, MG
    Floudas, CA
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2001, 40 (22) : 5040 - 5041
  • [23] Reply to comments on "An improved continuous-time formulation for the short-term scheduling of multipurpose batch plants"
    Castro, P
    Barbosa-Póvoa, APFD
    Matos, H
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2001, 40 (22) : 5042 - 5042
  • [24] Novel Multiple Time-grid Continuous-time Mathematical Formulation for Short-term Scheduling of Multipurpose Batch Plants
    Li, Dan
    Rakovitis, Nikolaos
    Zheng, Taicheng
    Pan, Yueting
    Li, Jie
    Kopanos, Giorgos
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2022, 61 (43) : 16093 - 16111
  • [25] Efficient Precedence-Based Multistage Batch Scheduling Formulation with Nontrivial Tightening Constraints
    Marchetti, Pablo A.
    Cerda, Jaime
    27TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT B, 2017, 40B : 1429 - 1434
  • [27] Mixed-integer linear programming model for short-term scheduling of a special class of multipurpose batch plants
    Moon, Sungdeuk
    Hrymak, Andrew N.
    Industrial and Engineering Chemistry Research, 1999, 38 (05): : 2144 - 2150
  • [28] An MILP Approach for Short-term Scheduling of Batch Operations
    Mostafaei, Hossein
    Harjunkoski, Iiro
    29TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT A, 2019, 46 : 649 - 654
  • [29] SHORT-TERM SCHEDULING FOR MULTIPRODUCT BATCH CHEMICAL-PLANTS
    EGLI, UM
    RIPPIN, DWT
    COMPUTERS & CHEMICAL ENGINEERING, 1986, 10 (04) : 303 - 325
  • [30] A robust optimization approach for short-term scheduling of batch plants under demand uncertainty?
    Zhu, Jin
    Gu, Xingsheng
    Gu, Wei
    KYBERNETES, 2011, 40 (5-6) : 860 - 870