On the use of waste heat in a two-stage production system with controllable production rates

被引:25
|
作者
Biel, Konstantin [1 ]
Glock, Christoph H. [1 ]
机构
[1] Tech Univ Darmstadt, Inst Prod & Supply Chain Management, Hsch Str 1, D-64289 Darmstadt, Germany
关键词
Waste heat; Two-stage production system; Energy costs; Batch sizing; Variable production rate; ORGANIC RANKINE-CYCLE; LOT SCHEDULING PROBLEM; LOOP SUPPLY CHAINS; THERMODYNAMIC ANALYSIS; RECOVERY SYSTEM; ENERGY; ELECTRICITY; ORC; OPTIMIZATION; INDUSTRY;
D O I
10.1016/j.ijpe.2016.07.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Industrial energy consumption accounts for approximately one third of the energy consumed by the four major end-uses of energy (i.e., residential, commercial, industrial, and transportation energy use). Manufacturing is thereby responsible for the majority of energy that is consumed in industry. The scarcity of resources, rising energy prices, and an increasing awareness that lowering energy usage is a prerequisite for sustainable production processes has induced researchers to consider energy consumption in the management of production systems. This paper contributes to this emerging stream of research by studying the role of waste heat in production planning and control. More specifically, it investigates the case where industrial waste heat can be converted into electricity, which can then be used to support operating the production stages. This paper introduces the generation and transformation of waste heat into a lot size model and investigates how lot sizing policies change if waste heat is used to operate the system. Special attention is paid to the scheduling of interruptions between production runs and the determination of optimal production rates. The results of the paper indicate that using waste heat resulting from production reduces the overall energy requirements of a production system. The inventory policies developed in this paper support an efficient use of waste heat. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:174 / 190
页数:17
相关论文
共 50 条
  • [31] Optimal production run time for two-stage production system with imperfect processes and allowable shortages
    Pearn, W. L.
    Su, R. H.
    Weng, M. W.
    Hsu, C. H.
    [J]. CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2011, 19 (04) : 533 - 545
  • [32] Optimal production run time for two-stage production system with imperfect processes and allowable shortages
    W. L. Pearn
    R. H. Su
    M. W. Weng
    C. H. Hsu
    [J]. Central European Journal of Operations Research, 2011, 19 : 533 - 545
  • [33] Optimal ordering and production policy for a two-stage production delivery system under lumpy demand
    Feng, DZ
    Yamashiro, M
    Zhang, LB
    [J]. PROCEEDINGS OF THE 2003 IEEE/ASME INTERNATIONAL CONFERENCE ON ADVANCED INTELLIGENT MECHATRONICS (AIM 2003), VOLS 1 AND 2, 2003, : 833 - 837
  • [34] A production ordering system for two-item, two-stage, capacity-constraint production and inventory model
    Ishii, K
    Imori, S
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1996, 44 (1-2) : 119 - 128
  • [35] A two-stage production/inventory system with admission control of product returns
    Vercraene, Samuel
    Gayon, Jean-Phillipe
    [J]. PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT, 2011, : 537 - 546
  • [36] Learning effects and the phenomenon of moving bottlenecks in a two-stage production system
    Glock, Christoph H.
    Jaber, Mohamad Y.
    [J]. APPLIED MATHEMATICAL MODELLING, 2013, 37 (18-19) : 8617 - 8628
  • [37] Product prioritization in a two-stage food production system with intermediate storage
    Akkerman, Renzo
    van Donk, Dirk Pieter
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 108 (1-2) : 43 - 53
  • [38] Biohydrogen and biomethane production from food waste using a two-stage dynamic membrane bioreactor (DMBR) system
    Jung, Ju-Hyeong
    Sim, Young-Bo
    Ko, Jeun
    Park, So Young
    Kim, Gi-Beom
    Kim, Sang-Hyoun
    [J]. BIORESOURCE TECHNOLOGY, 2022, 352
  • [39] Ranking intervals for two-stage production systems
    Li, Yongjun
    Shi, Xiao
    Emrouznejad, Ali
    Liang, Liang
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2020, 71 (02) : 209 - 224
  • [40] Two-stage production scheduling with an outsourcing option
    Lee, Kangbok
    Choi, Byung-Cheon
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 213 (03) : 489 - 497