Effect of access management on the design of bicycle and pedestrian facilities

被引:0
|
作者
Falconi, XR [1 ]
机构
[1] Falconi Consulting Serv, Lake Oswego, OR 97034 USA
关键词
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The intent of this paper is to provide a background on access management practices in the state of Oregon, a brief discussion on the current transportation planning elements that encourage the application of access management techniques, and the relation of its applications on the design of bicycle and pedestrian facilities. It also contains a brief discussion of the Oregon Department of Transportation (ODOT) Access Management Policy and the Transportation Planning Rule (TPR), and how these elements are driving local communities toward implementing access management plans around the state.
引用
收藏
页码:125 / 133
页数:9
相关论文
共 50 条
  • [31] Design and performance analysis of pedestrian crossing facilities for continuous flow intersections
    Jagannathan, R
    Bared, JG
    [J]. BICYCLES AND PEDESTRIANS; DEVELOPING COUNTRIES 2005, 2005, (1939): : 133 - 144
  • [32] Explore effects of bicycle facilities and exposure on bicycle safety at intersections
    Cai, Qing
    Abdel-Aty, Mohamed
    Castro, Scott
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE TRANSPORTATION, 2021, 15 (08) : 592 - 603
  • [33] Analyzing the Effect of Bicycle Facilities on Commute Mode Share over Time
    Krizek, Kevin J.
    Barnes, Gary
    Thompson, Kristin
    [J]. JOURNAL OF URBAN PLANNING AND DEVELOPMENT, 2009, 135 (02) : 66 - 73
  • [34] Pedestrian Flow Characteristics for Different Pedestrian Facilities and Situations
    Rastogi, Rajat
    Ilango, T.
    Chandra, Satish
    [J]. EUROPEAN TRANSPORT-TRASPORTI EUROPEI, 2013, (53):
  • [35] The Design of Embedded Electric Bicycle Battery Management System
    Ren Wenju
    Ren Zhiqian
    [J]. 2014 IEEE TRANSPORTATION ELECTRIFICATION CONFERENCE AND EXPO (ITEC) ASIA-PACIFIC 2014, 2014,
  • [36] COMPUTERIZED FACILITIES DESIGN AND MANAGEMENT - AN OVERVIEW
    SKY, D
    [J]. IIE SOLUTIONS, 1995, 27 (08): : 43 - 47
  • [37] Linking programming and design with facilities management
    Erdener, E
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2003, 17 (01) : 4 - 8
  • [38] An evaluation of red shoulders as a bicycle and pedestrian facility
    Hunter, WW
    [J]. 43RD ANNUAL PROCEEDINGS - ASSOCIATION FOR THE ADVANCEMENT OF AUTOMOTIVE MEDICINE, 1999, : 29 - 43
  • [39] Design and Implementation of Battery Management System for Electric Bicycle
    Rashid, Muhammad Ikram Mohd
    Osman, James Ranggi Anak Johnny
    [J]. ENGINEERING TECHNOLOGY INTERNATIONAL CONFERENCE 2016 (ETIC 2016), 2017, 97
  • [40] LEVEL OF SERVICE ON PEDESTRIAN FACILITIES
    SENEVIRATNE, PN
    MORRALL, JF
    [J]. TRANSPORTATION QUARTERLY, 1985, 39 (01): : 109 - 123