Disassembly and Reassembly Sequence Planning Tradeoffs Under Uncertainty for Product Maintenance

被引:29
|
作者
Behdad, Sara [1 ]
Thurston, Deborah [1 ]
机构
[1] Univ Illinois, Ind & Enterprise Syst Engn Dept, Urbana, IL 61801 USA
基金
美国国家科学基金会;
关键词
INTEGRATED APPROACH; OPTIMIZATION; METHODOLOGY; PARTS;
D O I
10.1115/1.4006262
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The problem addressed in this paper is disassembly sequence planning for the purposes of maintenance or component upgrading, which is an integral part of the remanufacturing process. This involves disassembly, component repair or replacement, and reassembly. Each of these steps incurs cost as well as the probability of damage during the process. This paper presents a method for addressing these tradeoffs, as well as the uncertainty associated with them. A procedure for identifying the best sequence of disassembly operations for maintenance and/or component upgrade is presented. It considers both disassembly and reassembly costs and uncertainties. Graph-based integer linear programming combined with multi-attribute utility analysis is employed to identify the best set of tradeoffs among (a) disassembly time (and resulting cost) under uncertainty, (b) the probability of not incurring damage during disassembly, (c) reassembly time (and resulting cost), and (d) the probability of not incurring damage during reassembly. An example of a solar heating system is used to illustrate the method. [DOI: 10.1115/1.4006262]
引用
收藏
页数:9
相关论文
共 50 条
  • [31] Interactive AR-assisted product disassembly sequence planning (ARDIS)
    Chang, M. M. L.
    Nee, A. Y. C.
    Ong, S. K.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (16) : 4916 - 4931
  • [32] Model and algorithm of multi-product disassembly sequence planning problems
    Liang P.
    Fu Y.
    Tian G.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (07): : 2166 - 2174
  • [33] Objective selective disassembly sequence planning considered product fault features
    Yang D.
    Xu Z.
    Zhu J.
    Su K.
    Liu W.
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2019, 51 (07): : 160 - 170
  • [34] Optimizing facility maintenance planning under uncertainty
    Betz, Trevor
    El-Rayes, Khaled
    Grussing, Michael
    Bartels, Louis
    JOURNAL OF BUILDING ENGINEERING, 2023, 77
  • [35] Building maintenance strategies: planning under uncertainty
    Lind, Hans
    Muyingo, Henry
    PROPERTY MANAGEMENT, 2012, 30 (01) : 14 - +
  • [36] INTEGRATING IMMERSIVE COMPUTING TECHNOLOGY WITH MIXED-INTEGER NONLINEAR PROGRAMMING FOR DISASSEMBLY SEQUENCE PLANNING UNDER UNCERTAINTY
    Behdad, Sara
    Berg, Leif P.
    Thurston, Deborah
    Vance, Judy
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE 2012, VOL 3, PTS A AND B, 2012, : 1143 - +
  • [37] Disassembly sequence planning in a disassembly cell context
    Andres, Carlos
    Lozano, Sebastian
    Adenso-Diaz, B.
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2007, 23 (06) : 690 - 695
  • [38] Selective disassembly sequence planning under uncertainty using trapezoidal fuzzy numbers: A novel hybrid metaheuristic algorithm
    Zhang, Xuesong
    Fu, Anping
    Zhan, Changshu
    Pham, Duc Truong
    Zhao, Qiang
    Qiang, Tiangang
    Aljuaid, Mohammed
    Fu, Chenxi
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2024, 128
  • [39] Process planning for product disassembly
    Das, SK
    Naik, S
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (06) : 1335 - 1355
  • [40] Optimal maintenance period and maintenance sequence planning under imperfect maintenance
    Zhang, Xiaoqiang
    Jiang, Hao
    Zheng, Bo
    Li, Zhoushuo
    Gao, Huiying
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2023, 39 (05) : 1548 - 1558