Practically Feasible Optimal Assembly Sequence Planning with Tool Accessibility

被引:2
|
作者
Bahubalendruni, M. V. A. Raju [1 ]
Kumar, Gulivindala Anil [1 ]
Sankar, K. Madhu Sudana [2 ]
机构
[1] GMR Inst Technol, Rajam, Andhra Prades, India
[2] Tata Lockheed Martin Aero Struct Ltd, Hyderabad, Telangana, India
关键词
Assembly sequence planning; Liaison; Geometrical feasibility; Stability; Mechanical feasibility; Tool accessibility; Bounding box; ALGORITHM;
D O I
10.1088/1757-899X/390/1/012026
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Practically Feasible Optimal Assembly Sequence Plan (PFOASP) achievement is most important for an industrial engineer to meet the demand of producing the final product in less time and cost. A PFOASP directs the industrial engineer to generate a complete product with less number of manipulations from individual parts. An assembly sequence is said to be optimal from its nature of performing parallel operations to form stable subassemblies which directly reduces the overall assembly time for handling large scale products. Most the researchers followed to ignore tool accessibility in their approaches to avoid the computational complexities. However, the generated solution lacks completeness in practice because tools play the significant role while assembling operation. PFOASP determination is most challenging due to validation of multiple feasibilities qualifying criterion. In this paper, an attempt is made to explain the complexity and the importance of tool accessibility consideration in PFOASP with suitable illustrations. A tool based bounding box method is proposed to solve geometrical feasibility in PFOASP.
引用
下载
收藏
页数:8
相关论文
共 50 条
  • [41] A collaborative approach to assembly sequence planning
    Dong, TY
    Tong, RF
    Zhang, L
    Dong, JX
    ADVANCED ENGINEERING INFORMATICS, 2005, 19 (02) : 155 - 168
  • [42] Constraint evaluation for assembly sequence planning
    Rohrdanz, F
    Mosemann, H
    Wahl, FM
    1997 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP'97) - TOWARDS FLEXIBLE AND AGILE ASSEMBLY AND MANUFACTURING, 1997, : 263 - 268
  • [43] Modified approach to assembly sequence planning
    Nanjing University of Science and Technology, Nanjing 210094, China
    不详
    Zhongguo Jixie Gongcheng, 2007, 14 (1676-1681):
  • [44] Planning Assembly Sequence with Graph Transformer
    Ma, Lin
    Gong, Jiangtao
    Xu, Hao
    Chen, Hao
    Zhao, Hao
    Huang, Wenbing
    Zhou, Guyue
    2023 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION (ICRA 2023), 2023, : 12395 - 12401
  • [45] Assembly sequence planning for manufacturing by microrobots
    Fatikow, S
    Mounassypov, R
    1997 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP'97) - TOWARDS FLEXIBLE AND AGILE ASSEMBLY AND MANUFACTURING, 1997, : 269 - 274
  • [46] Assembly Sequence Planning for Mechanical Products
    姜华
    张玉云
    熊光楞
    周济
    Tsinghua Science and Technology, 1999, (02) : 64 - 67
  • [47] Subassembly identification for assembly sequence planning
    Wang, Yong
    Liu, Jihong
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (1-4): : 781 - 793
  • [48] Combining heuristics in assembly sequence planning
    Del Valle, C
    Toro, M
    Camacho, EF
    Gasca, RM
    Planning, Scheduling and Constraint Satisfaction: From Theory to Practice, 2005, 117 : 99 - 108
  • [49] A scheduling approach to assembly sequence planning
    Del Valle, C
    Toro, M
    Camacho, EF
    Gasca, RM
    PROCEEDINGS OF THE 2003 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP2003), 2003, : 103 - 108
  • [50] Neural dynamic assembly sequence planning
    Kitz, Kristof
    Thomas, Ulrike
    2021 IEEE 17TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2021, : 2063 - 2068